My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2024 CONSERVATION COMMISSION Minutes
>
09/12/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:19:07 AM
Creation date
3/13/2025 9:04:50 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Roll Call: <br /> Ms. Zollo (Yes), Mr. Cook (Yes), Ms. Thornbrugh (Yes), Ms. Godfrey (Yes), and Mr. <br />Colombo (Yes). <br />o The motion passes unanimously. <br /> <br /> BOARD OF HEALTH: The property is in Zone II and restricted to three (3) bedrooms <br />previously permitted by BOH. Raze and replace of the existing dwelling triggers the need <br />for full compliance with the BOH I/A Septic Systems Regulation unless BOH grants a <br />variance. Floorplans for the proposed new dwelling are to be reviewed upon submission <br />to the Building Dept. Rodent inspection by BOH is required before demolition, with <br />abatement if necessary. <br /> <br /> WASTEWATER: Pending connection to the Mashpee Sanitary Sewer Collection <br />System. This property is in the Mashpee planned Phase 2 sewer extension. Once the <br />sewer main has been installed, the property owner will receive a Notice to Connect at <br />which point they will have 90 days to complete the sewer connection. <br /> <br /> BUILDING: ZBA hearing 25-Sep-24 <br /> <br /> MASS DMF: See enclosed dated 27-Aug-24 <br /> <br />Documents provided: Meyer & Sons, Inc.; Notice of intent application and project narrative; September 3, <br />2024 (all plans), Proposed Revegetation Plan; Proposed Site Plan <br /> <br />6:39 <br />NOI #43-3287 <br />119 Daniels Island Road & 15 Waterway, Roland Bates, New Seabury Homes, LLC. <br />Representative: BSC Group (Owner of Record: New Seabury Properties, LLC) <br />(cont. 4/18, 5/9, 6/13, 7/25 & 8/22) Hannah Raddatz, Nick Galanis, Brian Yergatian, David <br />Crispin <br /> <br />Initial Proposal: <br /> Construction and maintenance of a single-family dwelling <br /> Features included a pool, patio, detached garage, I/A septic system, hardscaping and <br />landscaping <br />Revised Plan: <br /> Groundwater Elevation: <br />o Seasonal high groundwater elevation adjusted to 1ft, 2.5 feet lower than previous <br />estimates. <br /> Soil Absorption System: <br />o Separation increased to 5 ft; previously had less <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.