My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2024 CONSERVATION COMMISSION Minutes
>
09/12/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:19:07 AM
Creation date
3/13/2025 9:04:50 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
09/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agent Comments: <br /> Project locus is within LSCSF; no other wetlands or resource areas within 150ft <br /> Mitigation proposed to enhance wildlife habitat and provide some native vegetation on a <br />lot that is devoid of natural vegetation (lot developed in the 1950s) <br />Motion: <br /> Ms. Zollo made a motion to close and issue. Ms. Godfrey seconds the motion. <br /> Further discussion ensued, resulting in the addition of the following conditions: <br />o A 2-year mitigation monitoring contract <br />o Recording of the single-bedroom covenant with the registry of deeds. <br />Roll Call: <br /> Ms. Thornbrugh (Yes), Ms. Godfrey (Yes), Ms. Zollo (Yes), and Mr. Colombo (Yes). <br />o The motion passes unanimously. <br /> <br /> BOARD OF HEALTH: Raze and replace triggers the need for full compliance with <br />BOH I/A Septic Systems Regulation. Floorplans for proposed new dwelling to be <br />reviewed upon submission to Building Dept. I/A septic plans are to be reviewed upon <br />submission to BOH. Rodent inspection by BOH is required before demolition, with <br />abatement if necessary. <br /> <br /> WASTEWATER: This location has no planned connection to the Mashpee Sanitary <br />Sewer Collection System. <br /> <br /> BUILDING: ZBA hearing 9-Oct-24 <br /> <br /> <br />Documents provided: BSS Design; Notice of intent application and project narrative; August 12, 2024, Plot <br />Plan – Proposed House Reconstruction (2 sheets) <br /> <br />6:45 <br />NOI #43-3308 <br /> 25 Riverside Road, Kerry Oliver. Representative: Cape & Islands Engineering, Inc. <br />(Owner of Record: Karl F. & Carol A. Oliver, Trustees, The 25 Riverside Road Realty Trust) <br />(cont. 8/22) Mark Dibb <br /> <br />Proposed Project: <br /> Demolition of an existing non-compliant flood dwelling <br /> Construction of a new flood-compliant dwelling <br /> Installation of a new septic system and roof runoff infiltration measures <br /> Reduction in building footprint with improved zoning setbacks. <br />Environmental Considerations: <br />16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.