Laserfiche WebLink
 No further discussion. <br />Roll Call: <br /> Mr. Cook (Yes), Ms. Thornbrugh (Yes), Ms. Godfrey (Yes), Ms. Zollo (Yes), and Mr. <br />Colombo (Yes). <br />o The motion passes unanimously. <br /> <br /> BOARD OF HEALTH: The on-site conventional septic system can accommodate three <br />(3) bedrooms. No increase in flow was proposed. Setbacks from the tank and SAS must <br />be maintained, or a variance must be requested. Access to septic components must be <br />maintained. Note the location of the septic system and restrict equipment/ vehicle traffic <br />over non-load bearing (H-10) components. <br /> <br /> WASTEWATER: This location has no planned connection to the Mashpee Sanitary <br />Sewer Collection System. <br /> <br /> BUILDING: ZBA hearing 25-Sep-24 <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of intent application and project narrative <br />August 22, 2024, Site Plan <br /> <br />6:51 <br />NOI #43-3311 <br /> <br /> 18 Starboard Lane, Ryan Lenhart. Representative: Cape & Islands Engineering, Inc. <br />(Owner of Record: 18 Starbard, LLC) <br /> <br /> The house has been sold, leading to the request for a withdrawal without prejudice. <br /> <br />Motion: <br /> Mr. Cook motions to accept the withdrawal without prejudice. Ms. Zollo seconds the <br />motion. No further discussion. <br />Roll Call: <br /> Mr. Cook (Yes), Ms. Thornbrugh (Yes), Ms. Godfrey (Yes), Ms. Zollo (Yes), and Mr. <br />Colombo (Yes). <br />o The motion passes unanimously. <br /> <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of intent application and project narrative; <br />August 19, 2024, Septic Design Plan <br /> <br />ADJOURNMENT <br />19 <br /> <br /> <br />