My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/2024 CONSERVATION COMMISSION Minutes
>
10/10/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:08:22 AM
Creation date
3/13/2025 9:08:20 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Cook made the motion to close and issue with the following conditions <br />1. Weekly reports during the construction of retaining wall and foundation for <br />erosion control until the project is completed. <br />2. The conversion to a 4-bedroom house <br />3. Micro clover lawn <br /> Motion seconded by Mr. Sahl <br /> ROLL CALL: Ms. Zollo (Yes), Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Thornbrugh (Yes), <br />Ms. Godfrey (Yes), Mr. Colombo (No). <br />The motion passes (5:1) <br /> <br />Documents provided: Baxter-Nye Engineering & Surveying; Request to Amend Order of conditions 043-3024; <br />09/26/24 Plan “Existing Conditions Plan” (sheet C1.0); 09/26/24 Plan “Site Plan” (sheet C2.0); 09/26/24 Plan <br />“Details & Notes” (sheet C3.0); Recorded Order of Conditions; Recorded Amended Order of Conditions; Recorded <br />Extension <br /> <br />6:33 <br />NOI #43-3283 <br /> 135 Daniels Island Road, New Seabury Marina, LLC <br /> <br />Marina Expansion Project <br /> Proposed expansion and improvement dredging <br /> No changes to plans or narrative since the last hearing <br /> Waterways Commission concerns have been addressed <br /> Harbormaster stipulation: No boat cleats or mooring outside of new dock faces on <br />navigable channel <br /> Shellfish conditions: removal before dredging, replenishment after <br /> Shellfish mitigation fee of $3,060 <br />Project Details <br /> Decrease in the overall number of slips <br /> Realignment of slips <br />Shellfish Habitat Concerns <br /> Sarah raised concerns about significant impacts on shellfish habitat <br /> Mitigation measures discussed: removal of livestock before dredging, seeding after <br />project completion <br /> <br /> Harbormaster: No navigational or abutter concerns. The applicant was advised there are a <br />few requirements that need to be incorporated into the Order of Conditions listed as <br />follows: <br />1. There will be no docking or mooring of vessels at any time on the outside <br />faces of the new docks <br />2. There will not be any cleats installed on the outside faces of the new docks <br />3. Signage will be installed on the outside faces of the new docks advising <br />mariners that there will be no docking or mooring of vessels in this location <br /> Waterways: Requirement to be incorporated into the Order of Conditions listed as <br />follows: <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.