Laserfiche WebLink
 Add trees along south and east property lines <br /> Submit waiver requests for setbacks and vertical walls <br /> Submit architectural drawings with flood vent configurations <br /> Continuance requested for October 24 <br />Agent Comments <br /> No waivers requested from Reg.25 provisions (C)(4) – vertical walls and C7C – Setbacks <br /> The existing septic system is an IA sludge-hammer system. Nitrogen loading <br />Calculations have been provided (below 12 ppm-meets standards under Reg.30) <br /> Recommends elimination of existing driveway and replacement of driveway footprint <br />with native vegetation (shown in revised plan). The new proposed driveway seems more <br />than sufficient for parking purposes. <br /> <br /> Board of Health: Approved 4-bedroom I/A septic system installed in November 2023. <br />Adding any habitable space that meets the bedroom definition would be considered an <br />increase in flow and require a septic upgrade and full compliance with BOH I/A Septic <br />Systems Regulation. Floorplans to be reviewed upon submission to Building Dept. <br />Setbacks from tank and SAS must be maintained, or a variance requested. Access to <br />septic components must be maintained. Note the location of the septic system and restrict <br />equipment/ vehicle traffic over non-load bearing (H-10) components. <br /> <br /> Building: Project is a substantial improvement within flood zone. ZBA hearing 11/13 <br /> <br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br />System <br />MOTION <br /> Mr. Cook made a motion for the continuance to October 24 at 6:39 pm. <br /> Motion seconded by Ms. Zollo <br /> ROLL CALL: Ms. Zollo (Yes), Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Thornbrugh (Yes), <br />Ms. Godfrey (Yes), Mr. Colombo (Yes). <br />The motion passes unanimously. <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of Intent application and project narrative; 09/13/24 <br />Proposed Site Plan <br /> <br />6:39 <br />NOI #43-3313 <br /> 24 Seconsett Point Road, Joshua and Nicole Delman <br />Representative: Mark Dibb <br /> <br />Project Overview <br /> Proposed construction: single-family dwelling, detached garage, hardscaping, <br />landscaping, Title 5 septic and dock with timber walkway <br /> Vacant lot of 20,721 square feet <br /> Resource areas: land under the ocean, land containing shellfish, saltmarsh, BVW <br /> House and Dock previously approved in 2010; approvals expired in 2023 <br />7 <br /> <br /> <br />