Laserfiche WebLink
The motion passes unanimously. <br /> APPROVAL of MINUTES <br /> There are no minutes for approval. <br /> DISCUSSION <br /> • 275 Quinaquisset Avenue: Information presentation of forthcoming permit request to <br /> gauge commission feedback. <br /> Resource Areas: <br /> ■ Freshwater wetlands,Riverfront(Quaker Run), existing/active cranberry <br /> bogs. <br /> Project Scope: <br /> ■ Construction of condo units with associated appurtenances,parking, and <br /> wetland restoration of existing cranberry bogs. The applicant wishes to <br /> have an informal discussion about this proposal prior to permit filing. <br /> Representative: <br /> ■ Mathew Eddy with Baxter-Nye Engineering <br /> Project Details: <br /> ■ 14 single-family units, each with 3 bedrooms and a 1-car detached garage. <br /> Each unit is approximately 2300 sqft. <br /> Site Acreage: <br /> ■ 3.5 acres of upland, 1.5 acres of wetland, and 3 acres of mitigation. <br /> Additional Information: <br /> ■ No mapped habitat priority or estimated habitat;no certified vernal pools. <br /> ■ The site has an existing single-family dwelling with a Title V septic <br /> system. <br /> ■ Additional golf amenities included in the proposal. <br /> ■ Drainage and stormwater management plans included. <br /> Impact Areas from the Project: <br /> ■ 0-50 ft buffer zone <br /> ■ 50-100 ft buffer zone <br /> ■ Proposed wetland fill <br /> o Mitigation includes the removal of 2.5 acres of active bog and restoration into a <br /> natural wetland system. <br /> COMMISSIONER COMMENTS <br /> o Runoff concerns <br /> o Wastewater treatment: <br /> o Current capacity 113,000 gallons per day <br /> o Max flow 60,000 to 70,000 peak season <br /> UPDATES <br /> 2 <br />