Laserfiche WebLink
• Representative: Down Cape Engineering <br /> • Request for a continuance to February 20, 2025 @ 6:30 <br /> • Reasoning: More time needed for revisions to address commission concerns <br /> Motion <br /> • Mr. Cook motioned to approve the continuance. Ms. Zollo seconded the motion. <br /> • Roll Call: Mr. Cook(Yes), Ms. Zollo (Yes),Ms. Thombrugh (Yes), Ms. Godfrey(Yes), <br /> Mr. Sahl(Yes), Mr. Colombo (Yes) <br /> o The motion passed unanimously <br /> Documents provided: Down Cape Engineering;Notice of Intent application and project narrative;09/09/24 <br /> Site Plan <br /> 6:33 NOI #43-3320 <br /> 9 Santuit Lane, TD Realty Partners,LLC (owner of record R.Investments, LLC) <br /> Mr. Cook recuses <br /> • Continued from 11/14/24 <br /> • Representative: Falmouth Engineering, Inc <br /> • Proposed raze and replace of an existing 2 bedroom single-family dwelling with a screen <br /> porch and approximately 600 sqft <br /> • New dwelling will be a 3 bedroom single-family dwelling,with no basement and a <br /> garage with overhead storage <br /> • House to be moved further back from Santurit Pond <br /> • New septic system with alternative component to replace substandard cesspool <br /> • Mitigation plantings proposed as per regulations <br /> • Lot area: 10,750 sqft,within 150 foot jurisdictional line <br /> • Board of Health approved variances for septic system setbacks <br /> • 1,000 sqft of mitigation planting proposed, exceeding the 145 sqft requirement <br /> Waiver Request&Environmental Concerns <br /> • Waiver requested for 75 ft naturally vegetated buffer requirement <br /> • Existing house from 1953 dilapidated condition, deemed dangerous by the building <br /> commissioner <br /> • Proposed improvements: moving house back, upgrading septic system, reducing nitrogen <br /> loading <br /> • Commissioners expressed concerns about extensive vegetation disturbance <br /> • Questions raised about the need for increased house size <br /> • Commissioners requested a detailed landscape plan <br /> Property Details & Nitrogen Loading <br /> • Discrepancy noted between assessing records(2 bedrooms)and owner's claim (3 <br /> bedrooms) <br /> • House unoccupied since at least 2019 approx. <br /> • New owner purchased property about 2 years ago <br /> • Proposed house footprint: 1,867 sqft(increased from 1,064 sqft) <br /> 5 <br />