Laserfiche WebLink
➢ Building: Application for ZBA relief has been filed <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br /> Collection System <br /> Motion <br /> • Mr. Cook made a motion to accept the continuance to January 23, 2025. Ms. Zollo <br /> seconded the motion <br /> • Roll Call: Mr. Cook(Yes), Ms. Zollo (Yes), Ms. Thombrugh (Yes), Ms. Godfrey(Yes), <br /> Mr. Sahl(Yes), Mr. Colombo (Yes) <br /> o The motion passed unanimously. <br /> Documents provided: Cape&Islands Engineering,Inc.; Notice of Intent application and project narrative; <br /> 01/02/25 Plan"Proposed Site&Septic Plan"(no increase in flow) <br /> 6:51 NOI #43-3326 <br /> 119 Daniels Island Road& 15 Waterway,New Seabury Homes, LLC <br /> • Representative: New Seabury Properties,LLC <br /> • Request for a continuance to February 6,2025 <br /> • Reasoning: Paperwork not filed for the Board of Health and ZBA <br /> Commissioners <br /> • Applicant to provide a copy of all plans submitted to BOH and ZBA <br /> Agent Comments <br /> • New NOI submission includes reduction of lawn areas(5% of total sq footage of lot), <br /> increased native species plantings& dewatering basin details provided <br /> • Areas of proposed grading/fill centered on septic system area and entrance to parcel from <br /> the main road. Existing parcel is slightly below the elevation of the road <br /> • Lot size is 80,000 square feet with 16,845 sq ft of natural vegetation proposed to be <br /> removed for all activities (home, landscaping, hardscaping, septic, etc). Area of proposed <br /> alteration is 17%of total square footage of the lot. <br /> • Proposal includes preservation of a 75 ft naturally vegetated buffer strip between work <br /> limit and waterbody/wetland edge <br /> • House foundation(which will be flood zone compliant)is more than 150 feet from the <br /> nearest waterbody. <br /> • if commission approves this proposal, Agent has the following recommendations: <br /> 1. Submission of a signed three-year mitigation monitoring contract between the <br /> property owner and a certified horticulturalist or professional wetland <br /> consultant <br /> ➢ Board of Health: New construction must meet full compliance with BOH I/A <br /> Septic Systems Regulation. Floorplans for proposed new dwelling to be reviewed <br /> upon submission to Building Department. Proposed septic design plans to be <br /> reviewed upon submission to BOH. <br /> 11 <br />