My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/26/2007 SELECT BOARD Minutes
>
02/26/2007 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 12:44:58 PM
Creation date
3/26/2025 10:25:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
02/26/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9 <br /> Board of Selectmen <br /> Minutes <br /> February 26, 2007 <br /> APPOINTMENTS AND HEARINGS: <br /> Assistant DPW Director; <br /> Recommendation for New Library Design: <br /> Catherine Laurent and members of the Planning & Construction <br /> Committee met before the Board to recommend the authorization of a <br /> $2,000,000 bond to supplement a$3,500,000 previously approved bond <br /> authorization for the design and construction of a new public library. The <br /> appropriation of$2,000,000 would be contingent upon approval of a debt <br /> exclusion question on the May 2007 general election ballot. <br /> Members of the Library Board of Trustees,the Town Librarian and <br /> interested public were also in attendance. <br /> Planning&Construction Committee member Sheldon Gilbert indicated <br /> the additional funding would allow the Town to move forward with one of <br /> two options. <br /> The first recommended option would allow for the design and construction <br /> of a 20,880 square foot library,the 5% allowable reduction of the"grant" <br /> building. This option is contingent upon the Town receiving the <br /> Massachusetts Public Library Construction Program grant. A decision on <br /> the grant application is forthcoming for fiscal year 2008, expected in July <br /> or August of 2007, The construction period for this building is <br /> approximately sixteen months. <br /> In the event the grant is not attained in the'summer of 2007,the additional <br /> option is to design and construct a one-story, 14,655 square foot library <br /> facility. This alternative building would be funded entirely by the Town <br /> using the existing $3.5 million appropriation and the additional $2 million <br /> from the anticipated bond. The construction period for option two is <br /> roughly twelve months. <br /> The committee presented floor plans of the two building scenario's. <br /> The Selectmen agreed to move forward with option one or two by the date <br /> of September 1, 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.