My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/09/2007 SELECT BOARD Minutes
>
07/09/2007 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 12:52:56 PM
Creation date
3/26/2025 1:22:38 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
07/09/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Board of Selectmen <br /> Minutes <br /> July 9, 2007 <br /> APPOINTMENTS AND HEARINGS: <br /> Mashpee Permanent Firefighters Association—Road Race: <br /> Correspondence was received from the Mashpec Permanent Firefighter's <br /> Association dated June 8, 2007 regarding a proposal to sponsor a road race <br /> to benefit their scholarship and wellness programs. The applicant <br /> requested the agenda topic be deferred until further notice. <br /> Planning& Construction Committee—Fire Substation: <br /> Members of the Planning & Construction Committee were in attendance <br /> to present to the Selectmen, schematic drawings and a site plan of the <br /> South Mashpee Fire Substation. Richard Pomroy the project manager and <br /> Deborah Durland the project architect were also present to discuss the <br /> project proposal for the substation to be located at 101 Red Brook Road. <br /> Fire Chief George Baker was also in attendance. <br /> It was,disclosed the fast track project presently falls within budget at a site <br /> location selected for adequate fire and rescue response time. Upon <br /> approval of the schematic design, construction documents are anticipated <br /> to be prepared in mid September and placed out to bid in early October. <br /> The construction project is anticipated to last six months with occupancy <br /> in June or July of 2008. <br /> The design of the intended facility is familiar in style to the main fire <br /> station headquarters. The colors have been retained to continue the fire <br /> station identity in the Town of Mashpee. Six full time firefighters per shift <br /> will be employed at the new substation. <br /> Peter Michaelson, Jr. was present on behalf of the Michaelson Family <br /> Trust to discuss his family concerns regarding the present design. Issues <br /> addressed related to lighting from the parking area and the noise from the <br /> engine exhaust systems. In response, Chief Baker indicated he would <br /> advocate for the engine exhaust to exit through the front of the building in <br /> a muffled type of system in an effort to be less disruptive to the neighbors. <br /> Additional landscape and fencing was also a consideration to lessen the <br /> engine noise and to buffer the lighting from the rear parking area. <br /> It was agreed the Assistant Town Manager would serve as a liaison to the <br /> area residents to address their concerns. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.