My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/2007 SELECT BOARD Minutes
>
09/24/2007 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 12:55:00 PM
Creation date
3/26/2025 1:31:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
09/24/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Board of Selectmen <br /> Minutes <br /> September 24, 2007 <br /> APPOINTMENTS AND HEARINGS: <br /> Public Hearin cont'd from September 10 2007 —Finally Dino's: <br /> The'Board of Selectmen opened the Public Hearing continued on the <br /> annual liquor license renewal of Barnstable Pizza& Pasta Co., Inc. d/b/a <br /> Finally Dino's, Constantinos Mitrokostas,Manager regarding the matter <br /> of compliance was it relates to the Massachusetts Fire Safety Act requiring <br /> automated sprinkler systems by the date of November 15, 2007. <br /> The Hearing notice was read aloud in accordance with posting <br /> requirements. Dino Mitrokostas met before the Board to discuss the <br /> progress of the sprinkler system installation at Finally Dino's and Dino's <br /> Sports Bar. To date the project is on schedule to adhere to the issue of fire <br /> safety compliance. <br /> Correspondence was received from George Baker;Fire Chief dated <br /> September 20, 2007 regarding the status of the fire sprinkler system. <br /> Chief Baker was in attendance and was noted to be in agreement with the <br /> progress of the sprinkler system installation. An informal inspection was <br /> conducted by the Chief on this date. Sprinkler heads are visible in the <br /> ceiling and piping is present in the basement. The sprinkler valve has not <br /> been installed and it was noted the street line or flush line has not been <br /> tested or certified to date. However,the project is on schedule for <br /> compliance. <br /> Being no public comment,the Board motioned to continue the Hearing. <br /> Motion made by Selectman Cahalane to continue the Public Hearing <br /> of Finally Dino's to November 15,2007. <br /> Motion seconded by Selectman Taylor. <br /> VOTE: Unanimous. 4-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.