My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/08/2001 SELECT BOARD Minutes
>
01/08/2001 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 12:47:02 PM
Creation date
3/27/2025 2:17:17 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
01/08/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASCH ITrcTuat 1t.A11L5CA?z ARCHITECTURE PLANNING UREAN DESIGN <br /> Wallace Floyd Design Group <br /> ✓ 273 SUMMEt STREET BOSTON, MASSACNUSETTS 02210-I510 <br /> .T 617-)$0-7400 F 617•310-0011 1 V`CC.WALLA(;EpLOYO.CUsr, <br /> Mashpee Fire and Rescue Station <br /> Project Number: 19002 <br /> Proposed Change Orders to be incorporated into Contract Change Order #004 <br /> December 6,2000 <br /> The following Proposed Change Orders have been reviewed and approved by the <br /> Mashpee Fire Station Building Committee. Final approval is pending approval by the <br /> Mashpee Board of Selectmen. <br /> Approved Change <br /> COR# Description to Contract Sure <br /> 001A Credit for substitution of pvc for cast iron pipe ($39I) <br /> 0011) Sanitary drain line modification OH&P (see $64.36 <br /> CO#002) <br /> 006 Parking lot layout revision $2,386 <br /> 025 Credit`foi•deleting garbage disposal ($124) <br /> 031 Install cmu for bearing of rafters $589.93 <br /> TOTAL FOR CHANGE ORDER #004 $2 525.29 v <br /> print dam/time:12/05100 10:48 AM G:lprojecn119002.00U1 Payments and ChangesU Change OrderslCO_004-DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.