My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/24/2000 SELECT BOARD Minutes
>
04/24/2000 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 5:03:04 PM
Creation date
3/31/2025 1:21:06 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
04/24/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> Board of Selectmen <br /> Minutes <br /> April 24, 2000 <br /> APPOINTMENTS AND HEARINGS: <br /> Vanasse Hangen Brustlin—Route 130 Intersection: <br /> Greg Taylor, the Director of Public Works was present with <br /> representatives of Vanasse Hangen Brustlin, Inc. to discuss the <br /> Route 130/Great Neck Road North intersection improvement project with <br /> members of the Board of Selectmen. <br /> Joseph Mangi, Senior Project Manager discussed several critical issues <br /> associated with the subject intersection and requested input from the <br /> Selectmen with regards to preliminary planning and design perspectives. <br /> Planning and design issues include the maintenance of pedestrian <br /> accessibility across Route 130, alternative means of egress from the Town <br /> Hall parking lot to Route 130, control of access to the country store, bike <br /> path accessibility during construction and as part of the final design, and <br /> sidewalk construction. <br /> The Selectmen agreed that the following site issues should be considered <br /> in the design of the Route 130 intersection. The area is anticipated to be <br /> deemed a historic district. The future Mashpee Art House will be located <br /> in the subject area, and the existing burial grounds located adjacent to the <br /> Town Hall facility should not be disturbed. It was also noted that the <br /> northern egress from Town Hall is also a hazardous Iocation. <br /> Vanasse Hangen Brustlin is expected to bring forth their recommendation <br /> to the Board of Selectmen in June. The above referenced criteria will be <br /> considered in the design process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.