Laserfiche WebLink
A <br /> r . 4P f <br /> PROPOSED ACTIONS, SHORT- TO LONG-TERM <br /> Ramp Changes 1 Flow-Reducing Initiatives <br /> 1. Remove several of the existing plastic "Terse)e' barriers along the low <br /> flow point axis, to allow the water to flow in the manner in which the system was <br /> designed. (complete) Picture #1. <br /> 2. Install temporary asphalt berm_ at northern edge of military vehicle on- <br /> load area (see 8. below). (complete) Picture #6. <br /> 3. Install asphalt berm on road between tanks to eliminate run-on from <br /> former parking area. (complete) <br /> 4. Purchase 4' x 4' "Gelmats" for six drains in off- and on-load areas <br /> (complete) Pictures #8/9. <br /> 6. Install two new drainage structures, one with a vault, on the edge of the <br /> ramp. (3 months) <br /> 6. Install concrete berms on southernmost edge of off-load area. <br /> (3months) Picture #7. <br /> 7. Install drainage structure adjacent to the former POUAlert Parking <br /> Area. (3 months) <br /> B. Replace_temporary asphalt_berm on northern edge of military vehicle <br /> on-load area with permanent concrete berm (see 2. above). (3 months) <br /> 9. Clean and remove debris from existing catch basins. (complete) <br /> Picture #10. <br />