My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/10/1999 DESIGN REVIEW COMMITTEE Minutes
>
11/10/1999 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:05:58 PM
Creation date
4/1/2025 12:26:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/10/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Design Review -3- November 10, 1999 <br /> c. Building 15. Gae— Mr. Renz said a new element has been added; i.e. a stair <br /> turret to dress it up. Concerns centered on the need for screening of the roof top <br /> mechanical equipment, the need for a safe pedestrian crossing, the elimination of <br /> the straight line at the back of the building, and the placement of trees. <br /> VOTED: On a motion by Ms. LeBlanc and seconded by Mr. O'Hara is was <br /> unanimously voted to adjourn at 8:10 p.m. <br /> Respectfully submitted, <br /> &all i <br /> h�� <br /> ne A. Pierce, <br /> Recording Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.