My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/2001 DESIGN REVIEW COMMITTEE Minutes
>
06/27/2001 DESIGN REVIEW COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 5:03:13 PM
Creation date
4/1/2025 1:40:44 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/27/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Design Review Committee -2- June 27, 2001 <br /> Corner lot on two streets requires 75' Oakland Road front yard setback variance <br /> from Board of Appeals. A variance is needed for the 25' minimum buffer; no <br /> buffer exists, but existing road might be used as buffer. A 50' commercial <br /> residential buffer.required. Technical Review states there must be enough <br /> access for fire department equipment. There are no buffers shown on the plan. <br /> The plan shows drainage of water off the property and onto adjoining Lot 10; <br /> drainage should be worked into catch basins. A septic system is shown at the <br /> rear of lot, and the Committee advises septic system could be placed at the front <br /> of lot and put under pavement. A.grading plan is required. A handicap walk and <br /> stairs must be shown on plan; platform needed outside front door. The parking <br /> requirement is one space per 150 sq. ft. <br /> The Committee accepts the building structure itself. The proponent must submit <br /> a list of variances. The plan needs to be revised and redrawn, and the building <br /> should be shown on new plan. The proponent is scheduled to meet with Zoning <br /> Board on July 11th. <br /> Preliminary Plan Review <br /> I . . 84 Algonquin Avenue — Casey Tree &_Landscape, Inc. <br /> The proponent is Frank Casey, who is appearing for input and advice on <br /> preliminary plan and on residential issues. The proposed building is 80' by 40'. <br /> The indicated storage on this site would be landscaping material, such as <br /> granite, shrubs. There is a steep grade to one side of lot; proponent indicates <br /> major excavation work needed around this steep grade to make it more flat. <br /> One quarter of this lot has been designated a vernal pool site thus eliminating <br /> the only existing flat workspace area shown on preliminary plan. <br /> The lot needs all site area variances, including front yard setback and buffers. <br /> The building would need variance on 75' buffer from street. There is no parking <br /> shown on preliminary plan. The lot has a grading problem. There are issues <br /> with the residential district. Abutter may have paved over and past the lot line. <br /> The Committee feels the lot is too small and the plan doesn't work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.