Laserfiche WebLink
Sep-16-04 13:41 From-CAPE COD CMISSIM N63623136 T-269 P.03/12 F-999 <br /> large area toward the center of the clear cut.The Applicant plans to utilize the cleared area for <br /> truck turning space, and storage of vehicles and equipment related to the existing concrete block <br /> business on adjacent,leased property.The Applicant indicated there is potential for future <br /> development on the site,but nothing is proposed at this time. The Applicant l,as proposed <br /> mitigation in the form of permanent protection of 4 acres of land on site, and the revegetation of <br /> the buffer to Route 130. <br /> The site is zoned commercial C-3,which allows "covered wholesale and business storage",but <br /> does not allow open commercial storage of building materials. According to he Mashpee Town <br /> Planner,the parking and vehicle storage use proposed by Harwich Concrete Block is allowed in <br /> the C-3 Zone. <br /> The property abuts N'icoletta's Way to the south, existing commercial businesses along Echo <br /> Road to the north,open space to the West,and Route 130 and residences to tlic east. <br /> PROCEDURAL HWORX <br /> The Project was referred to the Commission by the Mashpee Building 1Depariment on August 22, <br /> 2002; The Commission received the referral on August 22,2002, A procedt iral hearing was <br /> opened on October 17,2002 by a hear, A8 officer,and continued. The hearing was closed by a <br /> hearing officer on January 13,200. Extensions for project review until September 26,2003,and <br /> then to September 26,2004 were granted by the Regulatory Committee on March 10,2003 and <br /> September 22, 2003,respectively. A duly noticed public hearing was conducted pursuant to <br /> Section 5 of the Act by an authorized subcommittee of the Commission on A ugust 12, 2004 at <br /> the Mashpee Town Hall. The public hearing was continued to September 2, 2004 and the record <br /> was left open for submission of written materials. <br /> The subcommittee held a public meeting ou Aug=26,2004. At that meetit;g,the subcommime <br /> voted unanimously to recommend to the full Commission that the Project be approved as a DRI, <br /> subject to conditions. A final public hearing;was Feld before the full C=ivlssion on September <br /> 2,2004. At this hearing,the Commission voted unanimously toapprove the Project as a DIU, <br /> subject to conditions. <br /> MATERL%LS SUBMITTED FOR 7HF.'REcoRD <br /> Alaterials submided by the Town: <br /> •Letter from T. Fudala dated September 1,2004 <br /> • Email from T. Fudala dated August 13,2004 <br /> •Email from Tom Fudala,Town Planner,dated August 13,2004_ <br /> Letter from Russell Wheeler to Harwich Concrete Block-dated July 21,2004 <br /> s DM Referral via fxx August 22,2002 fmnn R. Wheeler <br /> •Copy of Mashpee Design Review Committee meeting minutes of July 24, 2002 meeting, via <br /> fax August 21,2002 to Doff Fox. <br /> •Letter from Russell Wheeler,Mashpee Building Inspector, to Harwich Concrete Block dated <br /> May 15,2002 <br /> 532 Mairt stmet'6R#0 026-Decisior. <br /> Septcmber 2.2004 <br /> 2 <br />