My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/2007 SEWER COMMISSION Minutes
>
06/19/2007 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 5:00:22 PM
Creation date
4/7/2025 3:40:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tom asked, if a cluster system is recommended, will Pio look for a parcel to put the system on? How <br /> will he decide between cluster and individual system? <br /> Pio said the first criteria is how much nitrogen has to be removed <br /> - can groundwater treatment system be used, very inexpensive <br /> - can individual system be done there—depending on lot size and if environmentally sensitive (i.e. <br /> Wetland <br /> If individual system cannot fit, has to be off site solution. <br /> In some watersheds, everyone needs 100% of nitrogen removed. <br /> There is a total mass of nitrogen that must be removed from the overall watershed. Can mix it between <br /> sub watersheds as long as the total is removed. <br /> Pio said the interest rate used must be agreed upon and be consistent with Stearns and Wheler. <br /> Tom asked how the town could convince homeowners to install individual systems? <br /> Pio said it is an interesting question. There is an equity issue. Everyone is contributing to the nitrogen <br /> load. Equitable "charging" for the system will be a challenging issue. <br /> 7 copies of the report will be delivered. <br /> Pio said it is advantageous to submit an interim report/1"draft with existing conditions and the <br /> summary information he will be using. <br /> He can complete it within 2 months of receiving the data. <br /> Matt wants to be sure Pio and Stearns and Wheler's scope match up so, Pio should give S & W a first <br /> draft of the data he is using as well. <br /> ** Matt made a motion to approve the contract with Lombardo &Associates for S4,000. Tom <br /> seconded the motion. All members were in favor 2-0** <br /> Meeting adjourned at 7:55 p.m. <br /> Minutes submitted by Arden R. Cadrin <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.