Laserfiche WebLink
Table A-7_ Sub-embayment and surface water loads used for total nitrogen <br /> modeling of the Popponesset Bay system,with total watershed N loads, <br /> atmospheric N loads,and benthic flux. These loads represent Scenario LAW <br /> loading conditions for the listed sub-emba ents- <br /> direct <br /> watershed load benthic flux <br /> sub-embayment atmospheric (kg/day) <br /> ( day) deposition(k da ) <br /> Popponesset Bay 1.005 4.005 --2.885 <br /> Popponesset Creek 1.721 - -0.366 <br /> Pinquickset Cove 0.573 0.290 -0.187 <br /> Ockway Bay-lower - - -0.822 <br /> Ockway Bay-upper 0.893 1.093 1.766 <br /> Mashpee River 4.970 0.663 8.433 <br /> Shoestring Bay 3.737 2.233 -7.537 <br /> Surface Water Sources <br /> Mashpee River 13.074 - - <br /> Santuit River(Shoestring Bay) 11.655 - - <br /> Quaker Run River(Shoestring Bay) 3.304 - - <br /> TOTAL 40.932 8.285 -1.597 <br />