Laserfiche WebLink
- .� F'opponesset��Bayi <br /> �„ MfP Wa,�terrsilied! <br /> N�Loadings Module; <br /> Parcel by parcel analysis <br /> , of existing and build-out <br /> ' nitrogen loads <br /> Land use.at use; <br /> *N snp�eee 2001/199.7 1999 <br /> °Sanclmc 2000 1998 20Q0 <br /> Barnsstable 2000{ 91 98- 2000 <br /> :} +suiii -out reviewed ana <br /> pproved ny town.planners <br /> T' <br /> s �nE �a tfj � bd <br /> �' 'ie'�nical'f,�UpOtrtl. <br /> Popponesset Bay <br /> ' �� __� I�fEP Scenarios <br /> Pre-assessment Background <br /> 2004, Sept Popponesset Bav MEP Technical Report released <br /> z005, lan East Wa uoit Ba MEP Technical R.epart released <br /> 2006, Moir PopyonesseVBayiPilotr, Modeling Scenarios <br /> MEP Technical"Memorandum relea es d <br /> 2 scenarios with removal of existing wastewater nitrogen <br /> loads from selected watersheds <br /> =� both met thresholds <br /> 2 scenarios with improved on-sits wastewater treatment <br /> t . <br /> throughou watershed (25% and 45- /% reduction} <br /> neither met thresholds <br /> 1 scenario using abandoned Santuit R bogs to naturally <br /> reduce N{estimated' boast of 40°f� 0r more) <br />