My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/06/2025 CONSERVATION COMMISSION Minutes
>
03/06/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 5:00:22 PM
Creation date
6/13/2025 2:21:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/06/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Some trees will need to be removed, but important trees are marked to remain <br /> • Commissioners noted significant environmental improvement over current conditions <br /> Special Considerations & Motion <br /> • Cesspool removal from groundwater protection district <br /> • Stormwater management plans using vegetative depression/rain garden <br /> • Potential osprey nest identified in chimney requiring special attention <br /> • Migratory bird regulations and timing of construction discussed <br /> • Commission praised creative vegetative depression solutions and plan selections <br /> • Ms. Godfrey made a motion to close and issue with conditions specified by the agent <br /> comments below <br /> • Mr. Sahl seconded the motion <br /> • Vote: Mr. Larson (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Mr. Colombo (Yes) <br /> o Motion passed unanimously <br /> Agent (Resource Areas: Buffer zone to BVW and Land Under Waterbodies/Waterways <br /> associated with Santuit Pond) <br /> • Revised plan submitted based on commission/staff concerns from the original <br /> presentation; two car garages have been removed; mitigation increased, and landscape <br /> details provided <br /> • If the commission approves the proposal, staff recommend the following conditions: <br /> 1. Any restored/new lawn areas are restricted to no more than 10% of lot square <br /> footage <br /> 2. Native clover mix for any lawn areas <br /> 3. Submission of a signed 3-year mitigation monitoring contract between a <br /> property owner and a qualified horticulturalist or wetland consultant <br /> ➢ Board of Health: New septic construction must meet full compliance with BOH I/A <br /> septic systems regulation. Any disposal system variances shall be heard before the <br /> approving authority the BOH <br /> ➢ Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br /> Collection System <br /> ➢ Building/ZBA: Scheduled with ZBA March 121h <br /> Documents provided: Falmouth Engineering,Inc.; Notice of intent application and project narrative; <br /> 08/05/24 Plan"Site Plan—Existing Conditions"(sheet 1 of 3); 02/18/25 Plan"Site Plan—Proposed House" <br /> (sheet 2 of 3); 08/05/24 Plan"Septic System Details" (sheet 3 of 3); 02/25/25 Plan"Mitigation Landscape <br /> Plan"Yarmouthport Design Group <br /> N I <br /> 23 Wilsons Grove, Clancy Construction <br /> ➢ Representative: Strong Tree Engineering <br /> ➢ Continued from February 20, 2025 <br /> Project Proposal <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.