My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2025 CONSERVATION COMMISSION Minutes
>
02/20/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:28 PM
Creation date
7/21/2025 3:22:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Commissioner raised concerns about buffer loss and ecological impacts <br /> • Project includes approximately 17,500 sqft of total lawn area <br /> Final Discussions <br /> • The assistant agent suggested considering a reverse osmosis irrigation system to reduce <br /> nitrogen further <br /> • The agent recommended pursuing the whole 5 acres of bog restoration to align with <br /> conservation objectives <br /> • The project team will coordinate with staff to establish the next hearing date <br /> • Create detailed bog restoration plans <br /> Agent Comments <br /> • Project revisions include reduced impacts to isolated and freshwater wetlands <br /> • Applicant has responded to concerns/issues raised in the Peer Review from LEC <br /> Environmental <br /> • The riverfront area of Quaker Run adjacent to the subject lot is currently an active stretch <br /> of cranberry bog and is thus highly degraded in terms of habitat value and water quality. <br /> Based on existing conditions, the standards for development or redevelopment within the <br /> riverfront may be waived. The subject lot is partially developed with an existing single- <br /> family home, driveway, septic system, landscaping, and hardscaping. <br /> • Proposed mitigation includes abandonment and wetland restoration of 5 acres of adjacent <br /> active cranberry bogs, which exceeds the required mitigation <br /> ➢ Board of Health: No comment, refer to Sewer Department <br /> ➢ Building/ZBA: No ZBA jurisdiction under Planning Board review <br /> ➢ Wastewater: This location is serviced by a privately owned wastewater treatment facility <br /> and will require a Flow Neutral By-law review by the Mashpee Sewer Commission per <br /> Chapter 108. <br /> Motion <br /> • Mr. Cook made a motion to continue to a date to be determined, which Ms. Zollo <br /> seconded <br /> • Vote: Mr. Cook(Yes), Ms. Zollo (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Ms. <br /> Clapprood(Yes), Mr. Colombo (Yes) Motion passed unanimously <br /> Documents provided: Baxter Nye Engineering,Inc.;Notice of Intent,application and project narrative; <br /> 10/13/23 Plans"Site Construction Plans"(16 pages); Cranberry Point at Willowbend <br /> NOI <br /> 43-3314 291 Monomoscoy Road, Jaques N. Morin, Trustee, The 291 Monomoscoy <br /> Realty Trust <br /> ➢ Representative: Down Cape Engineering <br /> ➢ Continued from Sep 26, 24,Nov 14, 24, Jan 9) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.