My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2025 CONSERVATION COMMISSION Minutes
>
03/20/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:32:30 PM
Creation date
7/21/2025 3:23:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Motion: Mr. Sahl made a motion for a continuance to April 3rd, which Ms. Godfrey <br /> seconded. <br /> • Vote: Mr. Sahl (Yes), Ms. Godfrey (Yes), Ms. Thornbrugh (Yes), Ms. Clapprood (Yes), <br /> Mr. Colombo (Yes) <br /> • The motion passed unanimously <br /> Agent <br /> • Land Subject to Coastal Storm Flowage (Landlocked. No other wetlands within 150 feet <br /> of subject lot) <br /> • Lot size is 12,196 sqft. Regulation 25 C.D. requires 20% of the lot area within wetlands <br /> jurisdiction to be maintained in a naturally vegetated state (the entire lot is in the 100- <br /> year floodplain) <br /> • 2 trees requested to be removed in that area, causing issues with the house foundation. 5 <br /> other trees requested to be removed for jet ski and boat storage <br /> • Recommendation <br /> o Approval for the removal of 2 trees causing issues with the house foundation, but <br /> does not recommend approval of additional removal of trees for boat/jet ski <br /> storage <br /> o The trees around the perimeter of the home are the only remaining ones on the lot <br /> and thus should be preserved in accordance with applicable standards under <br /> Regulation 25 <br /> ➢ Building (for Planning): May need to apply for exemption from Tree Preservation <br /> Bylaw <br /> Documents provided: Request for Determination of Applicability application; 01/17/25"Plot Plan"by All <br /> Cape Septic and Survey <br /> Cf1C <br /> 31 Fiddler Crab Lane, Prescott White &Adam Echart <br /> ➢ Representative: Merrill Engineers and Land Surveyors <br /> ➢ Continued from March 6 <br /> ➢ Order of Conditions #43-3231 <br /> ➢ Review: <br /> o Project involves decaying wall reconstruction with mitigation plant on top of <br /> coastal bank <br /> o Three-year mitigation monitoring conditions required as part of the contract <br /> ➢ PASSEVI) <br /> Agent <br /> • Ongoing conditions will be added for submission of remaining monitoring/maintenance <br /> reports <br /> • Signed contract with qualified contractor has been submitted <br /> Motion <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.