Laserfiche WebLink
Criteria ....._m__ _.__...... Existing (if applicable) _...... low in square peat) <br /> Please complete the table below(Lot area and structure co_verae should be shown below pro osed <br /> Lot Area(inland) <br /> idt Area wetlands <br /> ' <br /> Lot Area(total) 40,000 s�l..ft....— _.. mm 18.67 o ft LCS.F _...a . 0�. ........ ...._ ..... <br /> Frontage 150' 1 g3 193 <br /> Structure Covers ye* <br /> .. _ � 1,544 sw�ft- 3,264 sq.ft._._ _..... .. � .. . <br /> p Lot Covera a** 20% .._....._.. 100.°�a_ ... ....... _,._.. ...._._ _.._.. 1_00% ...._ _ <br /> . ....... _.m.......... . ........... <br /> Buildm Height 35'ww ...._._.w.. �.05'.,_.._ _. _.._ 32.5` ...... <br /> Side .............8'..w ... r �' 38 4' W 61.2;. ,E w <br /> Yard Setback(s) .15......... 43.8 W)' S8......._ . _._. � ..._)-...._.._w_..( .. <br /> Front Yard Setback __.._40`....... 22 9'(house) 3 2'(shed) 3 2' house <br /> Rear Y ar d Setback 15' 19 <br /> _. _ _..... _w _ .... _w_ ....ww w ... .21 ................ <br /> _. ww............. <br /> Setback to Water and Wetlands ww ____....... _ _....... .. .............._....wwww_w_.........0.'........ <br /> ....._._ <br /> For structure coverage please show the aggregate total of existing and proposed structures on the site in <br /> square feet including but not limited to houses,barns, sheds, garages,pools, carport,pergolas, etc. <br /> **Lot coverage shall be calculated utilizing the Structure coverage as the numerator and lot area exclusive <br /> of water and wetlands as defined in MGL Ch. 131 Sec 40 as the denominator. Land Subject to Coastal <br /> Storm Flowage is a wetland for the purposes of calculating lot coverage. <br /> Lot Coverage=Structure Coverage/Lot Area <br /> Accompanying Application Narrative: The application and plans must be accompanied by a written <br /> narrative prepared and stamped by a qualified registered design professional that describes the site's existing <br /> conditions.Further,the letter should include a description of the alterations proposed in the application and <br /> identify how the proposed continuance, extension, and/or alteration of any pre-existing nonconformities <br /> will not be substantially more detrimental to the neighborhood than existed previously.The narrative should <br /> describe the storm water management and drainage provided on the site and how it comports with the <br /> requirements of the Mashpee Zoning bylaws. Further, the narrative should attest to the accuracy of the <br /> information provided in the application including on the submitted plans, application form, and within the <br /> accompanying narrative. <br /> Signature of Ownep,<If Att u"Prvzo Re, ative(Attach written authorization signed by property owner <br /> if applicable): ° <br /> ...................... _ .: ... .. �...._.� w.._., .........._ <br /> Mail certified eTy,4 Decision to: Christo > er,J.. Kirrane, Esq., PO Box 560, Mash ee, MA 02649 <br /> Scheduled Date ��, f-, � TOWN CLERK_www � l� DATE STAMP <br /> Rev.0210212024 <br /> HAS VE TCW CLERK <br /> NOV G°24 AH9:12 <br />