My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/11/2024 ZONING BOARD OF APPEALS Decision
>
12/11/2024 ZONING BOARD OF APPEALS Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:18:17 PM
Creation date
7/22/2025 2:22:43 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Decision
Meeting Date
12/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A SPECIAL PERMIT <br /> Owners, Biria D. St. John and Elaina C. St. John, Trustees of the <br /> Biria D. St. John Trust under Declaration of Trust <br /> 17 Monomoscoy Road West, Map 114, Parcel 20 <br /> Mashpee, MA 02649 <br /> SP-2024-63 <br /> Mr. Morris stated that there is an obligation that this road would need to be cleared 16 ft. from 150 <br /> ft. from the furthest structure, and is the responsibility of the homeowners. He mentioned that the <br /> tree bylaw is being addressed with the Conservation Commission's order of conditions, and an <br /> exemption form can be submitted. He mentioned he had a conversation with Mr. Ciampi and the <br /> Fire Chief. Mr. Ciampi has a right to put a boulder on his property. Property access is not any <br /> concern or under the Zoning Board's purview. <br /> Mr. Borselli addressed the Board and confirmed a definition of a "structure", and under the <br /> Zoning bylaw,and Title 5 is not a structure which is under the State sanitary code and local health <br /> regulations; a septic system requires to be a distance of 10 ft.from a property line. These systems <br /> are under ground, and cannot be considered a structure. <br /> The Board had a discussion regarding the concerns of the abutter and finds that the septic system <br /> is not considered a structure because it is not counted as lot coverage under Zoning. The Board <br /> also acknowledged that during the final building inspection, a fire department inspection is <br /> performed, and will determine if there are any issues during the inspection. <br /> The Board wanted to know the specific construction to be performed on the new dwelling to <br /> provide flood zone compliancy. <br /> Mr. Borselli stated that the existing house is in a flood zone. There are requirements for <br /> construction in flood zones. The existing house pre-dates flood zone construction requirements. <br /> When this new house is constructed, it will conform to all construction under FEMA <br /> requirements. The first floor will be elevated above the flood zone, will have flood vents, and <br /> will be substantially more resilient to storm flooding than the existing house. The current house <br /> does not comply with flood zone or building code requirements. <br /> Mr. Bonvie asked if there is an increase in flood storage capacity. Mr. Borselli said; yes, with <br /> flood vents for water to flow, and to maintain the structural integrity of the new building. If there <br /> is a strong storm event, it will be significantly damaged. No mechanicals or habitable space are <br /> allowed in the basement. <br /> Mr. Goldstein confirmed that there cannot be any mechanicals or habitable space, and the State <br /> requires the basement to be 12 inches above the flood zone. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.