Laserfiche WebLink
Agent <br />Resource Areas: Land under waterbodies/waterways (Mashpee Pond). Inland bank and <br />buffer zone to the top of the inland bank. Rare species habitat-NHESP-Mashpee Pond <br /> The NHESP comment letter has not been received <br /> Dock does not require ZBA review <br /> Proposed deck meets performance standards for seasonal docks under Regulation 27 <br />expired <br /> Same driveway configuration/material proposed with this application (gravel) <br /> Letter from an abutter at 33 Sturgis Lane <br /> Recommendation: <br />o A continuance to allow time for proof of ZBA application submittal and receipt of <br />NHESP comment letter (assuming neither has been received/confirmed prior to <br />the hearing) <br /> <br /> Building/ZBA: Stair and pump house replacement requires ZBA relief. No application <br />submitted <br /> <br /> Harbormaster: No navigational or abutting concerns <br /> <br /> <br /> Abutter(s): See enclosed <br /> <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of Intent application and project narrative <br />03/04/2025 Plan “Proposed Pier & Stair Plan” <br /> <br />NOI (43-3336) <br />42 Nick Trail, Paul F. & Jean J. Hanley <br /> <br /> Representative: Cape & Islands Engineering, Inc <br /> <br />Project Overview <br /> Proposed demolition and reconstruction of single-family dwelling with deck, <br />hardscaping, landscaping, and Title V I/A septic system upgrade <br /> <br />Current Property Conditions <br /> Existing single-story dwelling of approximately 1,117 sqft with first floor elevation at <br />10.7ft, currently below 100-year flood elevation <br /> Entire property situated in AE-12 flood zone, with existing basement and crawl space <br /> Current 2-bedroom septic system with leach field installed in approximately 2007, pumps <br />to D box and leach field on left side of property <br /> <br />Proposed Development Plans <br /> New flood-compliant house in essentially exact location as existing structure with partial <br />pile-supported construction <br />8 <br /> <br /> <br />