My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2025 CONSERVATION COMMISSION Minutes
>
04/03/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:02:48 PM
Creation date
7/31/2025 2:01:25 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
04/03/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Lawn of micro clover mix <br />o Reduce lawn area to between 10% to 15% <br /> Ms. Godfrey seconded <br /> Vote: Mr. Cook (Yes), Ms. Zollo (Yes), Ms. Clapprood (Yes), Ms. Thornbrugh (No), Ms. <br />Godfrey (Yes), Mr. Sahl (Yes), Mr. Colombo (No) <br /> Motion passed 5 yay – 2 nay <br /> <br />Agent <br /> Resource Areas: LSCSF-AE Elevation 12 (no other wetlands within 150 ft of subject <br />property) <br /> <br /> Application filed with ZBA <br /> BOH will review upon receipt of the application <br /> Nitrogen loading calculations provided and fall below the 19 ppm threshold under <br />Regulation 30 <br /> Waivers requested from Regulation 25 (C)(7)(C) – setbacks and from Regulation 31 – <br />lawn coverage <br /> Plan calls out 2 oak trees to be removed; however, it is unclear as to why. No septic work <br />in that area <br /> Impervious driveway to be converted to pervious <br /> New home to have upgraded stormwater runoff capture and treatment <br /> Existing secondary pervious driveway to be reconfigured <br /> Recommendations: <br />o If commission grants waiver from lawn standards and approves 2 oak trees for <br />removal (based on acceptable rationale) <br />o Secondary driveway area could be converted to a mitigation planting area to <br />offset any impacts from the lawn areas <br />o Lawn area should be of a micro-clover mix as opposed to rye-fescue <br /> <br /> <br /> Board of Health: New septic construction must meet full compliance with BOH I/A <br />septic system regulation. Any disposal system variances shall be heard before the <br />approving authority of the Board of Health <br /> <br /> Building/ZBA: Project requires ZBA relief. Application has been submitted. <br /> <br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer Collection <br />system <br /> <br /> <br />Documents provided: Cape & Islands Engineering, Inc.; Notice of Intent application and project narrative <br />02/28/2025 Plan “Site Plan” <br /> <br /> <br />ADJOURNMENT <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.