My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2025 CONSERVATION COMMISSION Minutes
>
05/08/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:07:45 PM
Creation date
7/31/2025 2:07:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/08/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing fail tag tank to be pumped and filled in place rather than being removed to avoid <br />ground disturbance <br /> Recommendation for revised plan to reflect pump-and-fill procedure instead of tank <br />removal <br /> <br />Agent <br /> Resource Areas: Buffer zone to coastal bank and BVW/marsh; project locus is outside of <br />LSCSF <br /> New Title V I/A septic system to replace the existing failed system (failed SAS). <br /> No increase in flow <br /> No increase in bedrooms or living space <br /> Application revised to fully relocate septic system to the street side of the home as far <br />from resource areas as feasible. <br /> The original proposal was to replace the existing system in the side yard of the property <br /> Nitrogen loading calculations provided, which fall well below the threshold of 19 ppm <br /> Recommendation: <br />o Negative determination <br /> <br /> <br /> Board of Health: Variances approved by BOH April 30, 2025. New septic <br />construction must meet compliance with BOH I/A septic system regulations. <br /> <br /> Wastewater: There is no planned connection to the Mashpee Sanitary Sewer <br />Collection System <br />Motion <br /> Mr. Cook made a motion for a negative determination, which Ms. Clapprood seconded <br /> Vote: Mr. Cook (Yes), Ms. Clapprood (Yes), Ms. Godfrey (Yes), Mr. Sahl (Yes), Mr. <br />Colombo (Yes) <br /> Motion passed unanimously <br /> <br />Documents provided: Geo-Cape Environmental Consultants; Request for Determination of Applicability <br />application; 02/18/2025 Plan “Sewage Disposal System Plan” <br /> <br />RDA <br />51 Horseshoe Bend Way, Victoria Nguyan <br /> <br /> Representative: Engineering Works, Inc <br /> <br />Project Overview <br /> Septic system upgrade <br /> Property located on northeast side of Ashumet Pond, directly on pond with 150 ft setback <br />to bank and bordering vegetation <br /> Existing septic system currently in failure immediate replacement <br /> <br />Technical Specifications <br /> H22 compartment tank with S86 sledgehammer unit to be installed in front of the house <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.