My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/22/2025 CONSERVATION COMMISSION Minutes
>
05/22/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 2:14:52 PM
Creation date
7/31/2025 2:14:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Enclosed porch modernization with no second story addition above it <br /> Gravel driveway extension from existing driveway to new garage location <br /> Dry wells installation to collect and dispose of roof runoff post-project <br /> <br />Regulatory Compliance & Technical Details <br /> Resource identified as land subject to coastal storm flow within 100 ft of property <br /> 3-bedroom septic system maintained – ADU plus existing house remains three bedrooms <br />total <br /> Vertical additions will not exceed 50% volume of existing structure <br /> Garage slab elevation at 10 ft with base flood elevation at 12 ft requiring flood vents <br /> Smart vents to be installed per standard formula requirements <br /> Waiver requested from Regulation 25 C-7-C setbacks <br /> Nitrogen loading calculations provided <br /> <br />Tree Removal & Mitigation <br /> Two trees within garage footprint identified for removal <br /> Commission determined existing vegetation meets standards for isolated lots in coastal <br />storm flow areas <br /> Previous mitigation considered adequate – no additional requirements for tree removal <br /> <br />Agent <br /> Resource Areas: LSCSF (AE and V Zones) <br /> Proposed activities are within the AE flood zone and portion of work limit is within the V <br />zone <br /> Proposed detached garage with living space above and deck <br /> Addition of deck to existing house <br /> Proposed connection pipe from garage to existing septic system <br /> All activities proposed in previously altered and/or landscaped areas <br /> Waiting on confirmation of ZBA permit requirement <br /> No other wetlands within 150 feet of project locus/scope of work <br /> Nitrogen loading calculations – 9.56 ppm <br /> <br /> Board of Health: Septic system is designed for 3 bedrooms <br /> <br /> Building/ZBA: Application submitted. No hearing date set as of yet <br /> <br /> Wastewater: No planned connection to the Mashpee Sanitary Sewer Collection System <br />for the location listed <br /> <br />Motion <br /> Mr. Sahl made a motion to close and issue with no conditions, which Ms. Clapprood <br />seconded <br /> Vote: Mr. Sahl (Yes), Ms. Clapprood (Yes), Ms. Pitt (Yes), Mr. Colombo (Yes) <br /> Motion passed unanimously <br /> <br />9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.