My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/15/2025 CAPITAL IMPROVEMENT PROGRAM Minutes
>
01/15/2025 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:30:42 PM
Creation date
8/19/2025 12:29:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Meeting Minutes <br /> Capital Improvement Program Committee Meeting <br /> January 15, 2025 <br /> r. Collins inquired if the state is offsetting any of the coast for Food Service Equipment and Ms. Lopes <br /> explained that the School will apply for grants once those have been posted. She reminded everyone that <br /> the School is not eligible to apply every year. <br /> In response to a question, Mr. Moroney stated that the School would be using HubTech as the firewall <br /> provider. He stated that he applied for the E-Rate Program, and indicated that the district usually gets <br /> around $60,000, but that is not guaranteed. The School will replace three physical firewall units with Al <br /> enabled firewalls from the same provider. <br /> With respect to the Chromebook replacements,they will be HP products and the School reuses every part <br /> that it can before recycling the old canes. <br /> Proposed wireless upgrades at Quashnet and KC Coombs will brim the whole district in line. <br /> r.Collins questioned why the firewall was not projected for on last year's CIP outlook,and Mr. Moroney <br /> answered that it became a priority because of problems at the high school. <br /> At this time, while waiting for the DPW Director, Mr. Collins advised Committee members that the Fire <br /> Department, DNR and potentially Wastewater would be presenting at the next CIP meeting on January <br /> 2gt". r. Collins explained that the Wastewater Superintendent had been advised to brim his proposal <br /> before CIP if his intention is to submit an article for the May Town Meeting Warrant. Committee members <br /> were in agreement that future Wastewater projects should be brought before the CIP Committee, Mr. <br /> Collins stated that, in addition to transparency, there has to be a cost estimate and a scope for all <br /> Wastewater projects. <br /> r. Collins stated that, prior to the next meeting, if Committee members had any questions for <br /> Department Heads, to send those questions to the 'Town Manager, assistant Town Manager, and <br /> Administrative assistant Christine Willander, <br /> There was a brief discussion ablaut the CIP Calendar, and Mr.Collins advised members about the required <br /> CIP Committee public hearing on January 29th at 5 PM and his presentation to the Finance Committee on <br /> January 30th at 4 P <br /> PLANNING &CONSTRUCTION presenter: Catherine Laurent, DPW Director <br /> Flooring Replacement $100,000 <br /> Security Came ra/....... _ __.. .... <br /> VR Replacement $50,000 <br /> PD Station Renovation-�-Construction TRD <br /> Fire�I.a.r.m.System_ ...._. . ..�,_____.....____...__.._.._____.....___....__... ..__.____...__ ....�..._. <br /> Upgrades(Fire#1) $26,600 <br /> Roof Restoration ...... .... .. ...___... ..... .... <br /> Senior Center . (Membrane) $184,000 <br /> . .... _._ _ ,.,.CUpgrades ... ........ as-. _._ ... ._. <br /> School H pg $3,275,000 <br /> HS Roof Restoration (non-solar ...sections) $1 secti ,377,400 <br /> TH/archives Sewer Connect _....... <br /> ion � $60,000 <br /> Parking Lot Improvements—Design/Eng <br /> Senior Center Emergency Generator $60,000 <br /> ashpee Public Libra. .. . .Generator.... <br /> .r .t .r................................................................ ..... .16,000............. <br /> ry <br /> QS/ CC Bus AccessRoad Des.g /.E g.......................................................... ...$75,000................. <br />
The URL can be used to link to this page
Your browser does not support the video tag.