Laserfiche WebLink
o Ms.Nichols reported lake measurements taken by Ms. McManus on June 1'and <br /> 15'': 55.3 and 55.25 inches of water going over the board,with 11 inches in the <br /> stream both times <br /> o DPW gauge readings showed 11 on June 1', with 4.25 inches of rain and 10.5 on <br /> June 15t', with 1.79 inches of rain recorded in rain gauge <br /> o Canoe removal from public lands was successfully completed by the Assistant <br /> Conservation Agent after the committee reported it as improperly chained to tie <br /> fence <br /> NEW BUSINESS <br /> ➢ Approval of 2025 Spring Newsletter <br /> o Mr. MacDonald made a motion to approve the spring newsletter,which Ms. <br /> McManus seconded <br /> o Vote: 4 yay—0 nay <br /> o Motion passed unanimously <br /> ➢ Boat Ramp Letter of Support <br /> o Letter of support submitted by Mr. Bibo, for the Mashpee Wakeby boat ramp <br /> stormwater remediation project to the CZM Coastal Habitat and Water Quality <br /> Grant <br /> o Project funding breakdown: $350,000 from CPC, $350,000 from the State Office <br /> of Fishing and Boating Access for repaving, $350,000 from a private foundation <br /> grant, with additional CZM grant pending <br /> o Construction timeline: Project completion targeted for Memorial Day 2026 if final <br /> grant secured <br /> o Design includes five bio retention areas, engineered rain gardens,underground <br /> infiltration chambers,repaving,regrading, and improved site flow <br /> o Committee concerns about dock and beach access remain unresolved in the <br /> project documentation <br /> ➢ Mashpee Freshwater Pond Committee Newspaper Article <br /> o New regional committee formed with first meeting held, including representatives <br /> from multiple ponds, including Sue Dangle for Mashpee Wakeby <br /> o Aluminum Sulfate treatment approved for Wakeby Basin only, as groundwater <br /> feeds from north primarily affect this basin where cyanobacteria blooms occur <br /> o Treatment cost estimated at over$1 million for Wakeby Basin,with town of <br /> Sandwich willing to participate in funding <br /> o Town funding for permitting and dosing approved at May town meeting,with <br /> RFP being drafted for July I' <br /> UNANTICIPATED BUSINESS <br /> ➢ Mashpee River Restoration Project <br /> o Dan Kent(Assistant Conservation Agent) reported on river restoration project <br /> examining fish ladder/dam that has failed and requires state-mandated repair <br /> 2 <br />