My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/28/2025 CONSERVATION COMMISSION Minutes
>
08/28/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:27:56 PM
Creation date
10/14/2025 8:40:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Discussion: <br /> 0 Septic Upgrade: RDA vs NOI <br /> Vice Chair Thornbrugh suggested establishing criteria to guide septic upgrade approaches,particularly in <br /> sensitive areas such as the 75-foot buffer, flood zones, or near groundwater. She emphasized considering alternate <br /> solutions like relocating systems on the lot or using mounded systems and noted that failed or long-standing <br /> cesspools should be prioritized due to groundwater protection. <br /> Mr. Colombo distinguished between resource areas and buffer zones, citing state regulations (310 CMR <br /> 10.05(3)(b) (Department of Environmental Protection: Wetlands Protection) and MGL Ch. 131 §40. He explained <br /> that work in resource areas always requires positive determination (NOI) and that negative determinations are not <br /> legally allowed for private work, with public utilities as the only exception. Decisions in buffer zones are case-by- <br /> case, depending on project proximity to sensitive features and potential adverse effects. <br /> Mr. Sahl, a newer Commission member, said he generally relies on engineers' expertise for septic system <br /> placement and questioned whether failed systems require a longer approval process, deferring to staff on that <br /> point. Chair Cook clarified that filing an NOI does not lengthen the process but costs slightly more than an RDA, <br /> while allowing the Commission to place conditions on projects. He emphasized that the Commission reviews <br /> plans and suggests improvements but does not override engineers. <br /> Commissioners discussed that engineers are responsible for system design and placement, while the <br /> Commission's role is protecting resource areas. Redesigns can be suggested to improve protection, but the <br /> Commission does not supplant engineering judgment. Ms. Pitt agreed that failed systems require prompt attention <br /> and noted that applicants sometimes choose cheaper solutions, requiring careful Commission review. Ms. <br /> Godfrey added that consistent NOI requirements for both resource areas and buffer zones streamline the process <br /> and reduce uncertainty. <br /> Conservation Agent McManus and Assistant Conservation Agent Kent supported applying NOI requirements <br /> consistently across resource areas and buffer zones. Mr. Kent highlighted environmental risks from failed systems <br /> in Cape Cod's green watersheds and noted that exceptional cases could be handled administratively or through <br /> emergency certification. Mr. McManus added that some septic failures actively leach into groundwater, and in <br /> urgent situations, the Commission would defer to the Board of Health. <br /> Discussion of the Whippoorwill failed systems confirmed inspections by the Board of Health and assessed a <br /> moderate threat level. Mr. McManus recommended requiring NOIs consistently, noting minimal additional cost <br /> and improved clarity for applicants. Mr. Colombo explained that some systems labeled as failed result from <br /> property transfers, not malfunctions, but reiterated that NOIs are required for resource area and flood zone <br /> projects, with flexibility in buffer zones. <br /> Chair Cook agreed that requiring NOIs for both buffer zones and resource areas would simplify the process and <br /> allow the Commission to impose conditions or ask questions without interfering with engineering decisions. The <br /> Commissioners set September 18, 2025, as the effective date for applying the new NOI requirement and <br /> discussed communicating guidance online and via the consultant email list. <br /> Finally, Commissioners emphasized reviewing engineering designs for proper separation from groundwater and <br /> site-specific considerations, noting that using NOIs allows for placing conditions, requesting additional <br /> information, and addressing flood zone and environmental concerns. The discussion highlighted variable septic <br />
The URL can be used to link to this page
Your browser does not support the video tag.