My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/21/2025 CONSERVATION COMMISSION Minutes
>
08/21/2025 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:28:23 PM
Creation date
10/27/2025 10:04:01 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
08/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> however, maintained that independent review by a qualified professional was essential to ensure every <br /> precaution was taken to protect the Coastal Bank. <br /> Discussion followed about whether a general contractor's written assurance that no machinery would cross <br /> into the bank area would be sufficient or if external evaluation was still required. It was emphasized that the <br /> current plans lacked a clearly delineated limit of work line, contributing to confusion. The commission asked <br /> that the revised plans clearly show the limit of work along the Coastal Bank and, if possible, adjust it further <br /> landward to provide greater protection. <br /> Mr. Borselli described where the line would run—parallel to the property boundary and wrapping around the <br /> front of the house, marked by a double row of staked hay bales and flags for visibility. He confirmed that all <br /> demolition would occur from the landward side and agreed to include this detail in the revised narrative and <br /> plans. Commissioners would then decide whether a peer review by the Coastal Zone Management(CZM) <br /> office was necessary once the revisions were submitted. <br /> 19 Cricket Way—Foundation Design, Flooding Concerns, and Regulatory Requirements <br /> Mr. Colombo sought clarification regarding the foundation, explaining that he had visited the site and <br /> spoken with the owner earlier in the day. He confirmed that the property contained a full basement with <br /> concrete walls and a slab floor. He then referenced Regulation 25, which applies to new filings and <br /> incorporates projected 2050 flood exceedance levels. Based on the data, the property has a 50% exceedance <br /> probability by 2050 for flood events reaching depths of up to 10 feet. While the structure itself does not fall <br /> within the official Coastal A zone, the first 20 feet of the parcel does, making it highly vulnerable to flooding. <br /> Mr. Colombo expressed concern about how water entering through FEMA-compliant flood vents would be <br /> drained from the foundation area. He noted that similar nearby projects had been required to include cutouts in <br /> the slab floor—typically three-foot-square openings filled with crushed stone—to allow water to drain <br /> downward, preventing prolonged pooling and reducing the risk of channeling. He asked that the applicant <br /> return with a specific plan addressing how floodwater would exit the foundation. <br /> Mr. Borselli agreed with the concern and confirmed they could incorporate several cutouts in the new slab, <br /> as had been done in previous projects. He noted that while the home was not located directly within the special <br /> hazard area, it was very close to it. The architect, who would prepare the revised plans, could specify the <br /> number and size of cutouts needed. <br /> 19 Cricket Way- Structural Details and Construction Approach <br /> Another commissioner questioned how the proposed basement modifications would be executed given that <br /> the existing slab and foundation would remain in place. The applicant clarified that the existing foundation <br /> walls would be reused but that the old slab would likely be demolished. The lower portion of the basement <br /> would be backfilled with clean sand and compacted before installing a new slab at a higher elevation. The <br /> cutouts would be integrated into this new slab, allowing for proper drainage through layers of crushed stone <br /> into the subgrade. <br /> Mr. Colombo confirmed that this addressed his concern,provided the old slab was removed so that trapped <br /> water would not accumulate below the new floor. <br /> 19 Cricket Way - Landscaping,Nitrogen Loading, and Mitigation Requirements <br /> The question was then raised questions about the landscape plan, noting that it failed to specify what would <br /> happen to the rest of the property once construction equipment disturbed existing areas. The applicant's team <br /> explained that no formal landscaping was planned—the owners preferred a low-maintenance yard with a dirt <br /> and crushed stone driveway similar to the existing condition. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.