Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> be removed, and new stone would be installed, though any existing pieces of adequate size might be reused if <br /> deemed suitable by the contractor. <br /> 22 Triton Way- Engineering Details and Long-Term Stability Discussion <br /> Mr. Dibb continued to explain the construction sequence, noting that the work would begin with placement <br /> of five- to eight-ton "armor stones" set over a foundation layer of smaller one-ton stones. The intent, he said, <br /> was not to create a smooth, uniform slope but rather to introduce roughness and varied angles to absorb wave <br /> energy more effectively. In response to a commissioner's question, he clarified that armor stones are large, <br /> irregularly shaped rocks designed to resist wave impact and prevent erosion along the slope. <br /> Commissioners expressed curiosity about the engineering of the existing concrete wall, particularly how it <br /> has prevented water infiltration and erosion behind it over time. Mr. Dibb acknowledged uncertainty about the <br /> exact design but believed the return section of the concrete wall likely extended back into the bank at full <br /> height, offering additional stability. He pointed out that stones placed along the bottom of the structure were <br /> still properly sloped, suggesting that while the wall remained relatively stable for now, further deterioration <br /> would occur if left unrepaired. <br /> A commissioner emphasized that while the short-term safety concern was clear, the Commission also <br /> needed assurance that the long-term stabilization plan would not cause future destabilization or increase storm- <br /> related impacts. Mr. Dibb confirmed that the plan involved removing all existing boulders and rebuilding the <br /> revetment according to the new engineered profile. Larger"tow stones"would be installed at the base, <br /> properly aligned with the concrete wall, with materials transported and placed by barge. The resulting <br /> structure, he explained, would match the slope and stability of the newer neighboring revetments and comply <br /> with recommendations to remove and reconstruct the existing failed stonework. <br /> Mr. McManus expressed some concern about the higher proposed profile relative to adjacent revetments. He <br /> cautioned that a steeper, slightly forward section might be more vulnerable to storm surges and could create <br /> uneven wave deflection between properties. Mr. Dibb acknowledged the difference but maintained that the <br /> proposed design, if constructed as engineered, would be adequately stable and necessary to protect the end of <br /> the concrete structure. <br /> Commissioners discussed whether the proposed profile would result in two different slope angles between <br /> properties and how that might influence long-term erosion. Mr. Dibb admitted there would be a slight <br /> difference but emphasized that the stones' weight, slope, and rough finish would prevent significant scouring. <br /> Several commissioners agreed that while there was potential for minor variation, the immediate safety risk <br /> from the loose, teetering boulders outweighed those concerns. One commissioner added that the unstable <br /> condition posed a hazard to anyone walking on the rocks and that action needed to be taken promptly. <br /> 22 Triton Way- Consideration of CZM Review and Motion to Close <br /> Despite consensus on the need for safety repairs, a commissioner suggested that the project might still <br /> benefit from a Coastal Zone Management (CZM) or Barnstable County Extension technical review to <br /> evaluate potential long-term impacts and stabilization effectiveness. Mr. McManus agreed this could be done <br /> efficiently if the Commission provided CZM with both the current and existing revetment plans for <br /> comparison, along with a clear directive rather than two alternative design options. <br /> After discussion, the Commission agreed that the proposed plan and the existing neighboring profile could <br /> be forwarded to CZM for input. Any resulting recommendations could then be incorporated as conditions <br /> without reopening a full hearing, streamlining the process while ensuring technical oversight. Commissioners <br /> emphasized that a formal continuance was not necessary, given the urgency of the repair and the clear safety <br /> hazards on-site. <br /> 23 <br />