My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/20/2025 SEWER COMMISSION Minutes (2)
>
11/20/2025 SEWER COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 5:18:24 PM
Creation date
12/22/2025 10:56:58 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/20/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Sewer Commission <br /> t <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> rather when the Town submits its watershed permit application, which has not yet been filed. <br /> The deadline to submit that application is 2030, and the Town then has 20 years from that point <br /> to reach 75% of the required nitrogen reduction. <br /> UPDATED PHASING PLAN & ROUTE 151 CONSIDERATIONS <br /> GHD then presented a revised phasing plan, updated after coordination with DPW regarding <br /> newly paved roads and paving moratoria, particularly along Route 151. The plan still retains: <br /> • Phase 1 (existing work) and <br /> • Phase 2 (currently underway), <br /> followed by: <br /> • Phase 3: Waquoit area(previously selected by the Town as next in sequence), <br /> • Phase 4: Purple-coded areas including portions of Great Neck South near the rotary, and <br /> • Phase 5: A return to the Waquoit area once the Route 151 moratorium constraints ease. <br /> A Commissioner questioned why Route 151 construction should affect the schedule, arguing <br /> that a six-inch sewer line could be pushed under the roadway without major disruption and that <br /> this concern should not delay needed phases. Mr. Drainville acknowledged that there are <br /> additional utilities, including a gas line, and explained that the intent is not to postpone the work <br /> but to adjust sequencing "around"the paving program and moratoria. He stressed that all phases <br /> will still occur and that the overall nitrogen-reduction schedule remains intact; the Town is <br /> simply reordering parts of the work to respect the paving program while still meeting long-term <br /> goals. <br /> WAQUOIT PHASES & CONTINGENT PHASE 9 <br /> The discussion turned to which phases fall within the Waquoit watershed. Mr. Drainville <br /> indicated that Phases 3, 5, 7, and 9 are associated with the Waquoit area, as shown by the <br /> watershed boundary line on the map. He added that Phase 9 is not expected to be needed if <br /> nitrogen reductions in the earlier phases perform as planned, though the phase remains on the <br /> map as a contingency. The detailed rationale for why Phase 9 may not be required was still being <br /> developed and not fully presented in this portion of the meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.