My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/18/2026 PLANNING BOARD Minutes
>
03/18/2026 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 5:02:15 PM
Creation date
4/17/2026 12:15:12 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/18/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of TMs s,s <br /> z. <br /> Aannin Board <br /> c� <br /> 16 Great Neck Road North <br /> .wlashpee, Aassachusetts 02649 <br /> Fire hydrant added to location at the Fire Department's request, in combination with one at <br /> the road. <br /> Catch basin has moved, it is appropriately designed and can handle capacity. This results <br /> in some less work. The setback is15 feet, and some additional vegetation can remain. <br /> - The retaining wall on access road is shortened to a 3:1 grading with retaining. The <br /> consulting peer review was happy with this reduction, from 2:1. Now there is less grading <br /> and less happening in this area, other than widening of access and some filling. <br /> - The bus stop is still a discussion. <br /> Mr. Bogosian is happy to put the bus stop on site, but location might be best suited on the main <br /> road, but they would be happy to put in a condition. <br /> Ms. Waygan might add a friendly condition to site the bus stop 12 months out from issuance. <br /> Mr. Balzarini stated they could advertise every so often for a pickup at the Senior Center in <br /> Falmouth and bring people to the grocery store, for example, older people who cannot drive <br /> but need groceries. <br /> Ms. Waygan asked about the bike rack, with respect to the entrance. Mr. Bogosian answered <br /> they were thinking of bikers coming off the path and not having to trek across the parking lot <br /> with their bike, it is more relative to the location of the bike path. If the Board wants the rack <br /> somewhere else, they are open to that. There are two bike racks on site. Coming out of the <br /> main entrance, one is also located to the left. The Commission didn't want it to be hard to <br /> locate. <br /> Mr. Milbury is happy to see the entranceway in a far better position than the last hearing, it <br /> intersects with Ace somewhat but is better positioned here than towards the Shellback <br /> development. <br /> Mr. Dibb stated there is an existing driveway that only goes so far and the striping is 24ft. wide <br /> with two-foot shoulders. <br /> Mr. Tobin met with the Fire Department, and the FD wants to wait until we have final civil plans <br /> for one final review, to minimize back and forth. This was in response to their suggestions and <br /> he doesn't envision a problem. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.