My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2025 UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS Minutes (2)
>
12/15/2025 UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 5:04:30 PM
Creation date
4/27/2026 12:25:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
UPPER CAPE REGIONAL TRANSFER STATION BOARD OF MANAGERS
Meeting Document Type
Minutes
Meeting Date
12/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF MANAGERS <br /> UPPER CAPE L ST <br /> REGIONA TRANSFER ATION <br /> ........... <br /> December 15, 2025 <br /> 9:00 AM <br /> MashpeeTown Hall <br /> Waquoit Room <br /> Members Present: Catherine Laurent, Mashpee <br /> Peter McConarty, Falmouth <br /> Paul Tilton, Sandwich <br /> Members Absent: <br /> Colonial Timothy Gordon, MA ANG/JBCC (non-voting) <br /> Others Present: Carl Cavossa, Cavossa Disposal Corp. (CDC) <br /> Greg Crowley, Cavossa Disposal Corp. <br /> Jenn Bayuk, Barrows Waste Systems <br /> Bryan Barrows, Barrows Waste Systems <br /> Lee Koska, Weston& Sampson <br /> Qiang Shen, Weston & Sampson <br /> Nathan Seifert, Weston& Sampson <br /> Brenda Carney, Recycling Solutions <br /> Michael Mowbray, Recycling Solutions <br /> CALL TO ORDER <br /> The meeting was called to order at 9:00 am. <br /> APPROVAL OF MINUTES <br /> Minutes were not distributed prior; approval deferred to next meeting. <br /> 1. Status of Structural Report/Review of Upper Cape Transfer Station Buildings <br /> • Report Overview: <br /> • Lee Koska and W&S team presented an updated structural assessment. <br /> • Still pending response from MassDEP regarding full structural drawings, <br /> • Recommendations provided based on available information. <br /> • Key Structural Issues Found: <br /> o in Building: <br /> • Roof: Severely fire-damaged; recommendation to replace rather than <br /> repair. <br /> • Purlins and Beams: Visual twisting and loss of integrity; need <br /> replacement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.