Laserfiche WebLink
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> MOTION: To continue 29 Jeep Place to June 11, 2026. <br /> Motion by: Richard Sahl Seconded by: Paul Colombo <br /> Vote: Motion passed unanimously by roll call vote. <br /> Steve Cook, Paul Colombo, Richard Sahl, Seana Pitt <br /> NOI 29 Flat Pond Circle, Brian Gorin & Tina Choe, Trustees. Proposed installation of an <br /> in-ground pool and associated decking, residential additions, and landscape modifications. <br /> (Representative: Cape & Islands Engineering, Inc.) <br /> 43- <br /> 3422 <br /> Mark Dibb of Cape &Islands Engineering presented the Notice of Intent application on behalf of Brian Gorin and Tina <br /> Choe, Trustees, for proposed installation of an in-ground pool, associated decking,residential additions, and landscape <br /> modifications at 29 Flat Pond Circle. Also present were Bernice Waller,landscape architect,Attorney Brian Wall, and the <br /> applicants. <br /> Mr. Dibb stated that the existing site contained a single-family residence,with neighboring residences to the north, east, <br /> and south, and New Seabury open space to the west. He stated that the applicable resource areas included land subject to <br /> coastal storm flowage,based on flood elevation 14, and a coastal bank by definition due to slope within the flood zone. He <br /> stated that the coastal bank was not eroding,was not a sediment source, and functioned as a vertical buffer to flood waters <br /> only. The 75-foot and 150-foot buffer zones were shown on the plan. Mr. Dibb explained that the proposal included <br /> removal of the existing multi-level rear deck and reconstruction of a slightly smaller deck in the same location, <br /> construction of a proposed addition on the right side of the dwelling, installation of a pool and dry-laid pervious paver <br /> patio, and reconstruction/reconfiguration of the lower-level entrance and patio area. He stated that new drywell systems <br /> were proposed for the addition and lower patio area, and that the existing dwelling was already connected to drywells. He <br /> also noted that the property was connected to a private sewer system and therefore had essentially no nitrogen load. <br /> Mr. Dibb stated that the applicant submitted a mitigation table showing required mitigation of 2,591 square feet,with <br /> 2,599 square feet of mitigation proposed through the landscape plan prepared by Ms. Waller. He also stated that a <br /> Regulation 31 summary had been provided for proposed lawn and landscape alterations. He acknowledged that a portion <br /> of the pool and patio was proposed within the 0-to-75-foot buffer zone,but stated that the work would occur within <br /> existing lawn and landscaped areas and would not harm the values protected by the bylaw. <br /> Commission discussion focused on the location of the work within the buffer zone, the applicability of ACEC and coastal <br /> bank regulations,tree removal,mitigation, and whether the pool and patio could be shifted farther from the 50-foot buffer <br /> line. One commissioner raised concerns regarding Regulation 14, applicable to ACEC properties, stating that the materials <br /> did not appear to include a waiver request or analysis under that regulation. The commissioner noted that the Town GIS <br /> appeared to show most of the parcel within the ACEC and cited performance standards requiring no short-term, <br /> intennediate-term, or long-term adverse effects to protected wetland values through alteration of topography, soil <br /> structure,plant community composition, hydrologic regime, or water quality. <br /> Mr. Dibb responded that the ACEC boundary for this area was defined by the flood zone line and that no work, other than <br /> some plantings,was proposed within the ACEC as delineated on the plan. Discussion followed regarding the difference <br /> between GIS mapping and the regulatory definition of the ACEC boundary. Conservation staff stated that,if an on-the- <br /> ground survey had been completed to delineate the ACEC,that would be more reliable than GIS mapping. <br /> The Chair raised concerns that a significant amount of new hadscape,pool area, and structure was proposed within the <br /> 75-foot buffer zone and close to the 50-foot buffer line. He asked whether the pool and patio could be moved or reoriented <br /> farther north to reduce buffer impacts. Mr. Dibb and Ms. Waller stated that the pool location had been selected based on <br /> 10 <br />