My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/21/2026 CONSERVATION COMMISSION Minutes
>
05/21/2026 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2026 5:01:05 PM
Creation date
6/15/2026 11:22:55 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/21/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee Conservation Commission <br /> 16 Great Neck Road North <br /> Mashpee, MA 02649 <br /> Discussion also focused on whether the previously approved septic system's nitrogen calculations must nevertheless be <br /> considered as part of the total lot nitrogen analysis for the current project. The Chair noted that he had previously <br /> requested an analysis showing what additional nitrogen reduction might be achievable through use of a denitrifying <br /> system,not to impose a predetermined threshold,but to understand what improvements might be feasible for the site. He <br /> referenced Regulation 30 provisions allowing the Commission to request additional information regarding nutrient <br /> loading, groundwater flow, drainage patterns, and related environmental impacts,noting the property's proximity to <br /> Dean's Pond and associated wetland areas. <br /> The applicant's representatives responded that they did not believe the requested denitrification analysis was required <br /> because the septic system had already been approved,the current project involved no increase in bedrooms or wastewater <br /> flow, and the applicable provisions of Regulation 30 were therefore not triggered. Conservation staff provided <br /> clarification that certain Regulation 30 requirements might not have been mandatory if the project was properly <br /> characterized as redevelopment without increased flow, though the Commission retained discretion to request additional <br /> information. <br /> Attorney Wall maintained that the project met all applicable local, state, and regulatory standards, including Title V,the <br /> Wetlands Protection Act, and local performance standards, and argued that a project meeting those standards should not <br /> be found to create an adverse effect solely because additional theoretical reductions might be possible. <br /> The applicant, Brian Kelleher, addressed the Commission and stated that he purchased the property with an approved <br /> septic system and in reliance upon what he understood to be the applicable requirements. He stated that the project did not <br /> increase bedrooms or wastewater flow,that the applicant had revised the plans repeatedly in response to Commission <br /> comments, and that the proposal improved overall site conditions. He also referenced other nearby approved <br /> redevelopment projects with comparable nitrogen calculations and stated that while a denitrifying system would likely <br /> reduce nitrogen further,he believed the current proposal already complied with the applicable standards. <br /> Commissioners also discussed an apparent discrepancy between the current nitrogen calculation of approximately 15.9 <br /> parts per million and the previously referenced November septic approval calculation of approximately 15.749 parts per <br /> million. The applicant stated that the calculations should be reconciled and that the prior approved condition should serve <br /> as the baseline for comparison, as no substantive site changes had occurred since the septic approval. <br /> Given the ongoing dispute regarding regulatory interpretation,burden of proof, cumulative effects, and the scope of <br /> information required for review,the Chair recommended continuing the hearing to allow consultation with Town Counsel <br /> regarding the applicability of Chapter 172,Regulation 30, Title V, cumulative effects analysis, and the legal arguments <br /> raised by both the applicant and the Commission. The applicant agreed to a continuance for that purpose and requested <br /> that Town Counsel be provided with the applicant's May 14 legal letter, including the cited JMS Holdings case, along <br /> with the commissioner's written rebuttal and relevant project materials. The applicant also agreed to evaluate the potential <br /> nitrogen reduction achievable through use of a denitrifying system and to reconcile the nitrogen calculations presented in <br /> the record. <br /> MOTION: To continue 31 Nick Trail to June 11,2026. <br /> Motion by: Richard Sahl Seconded by: Paul Colombo <br /> Vote: Motion passed unanimously by roll call vote <br /> Steve Cook,Paul Colombo, Richard Sahl, Seana Pitt <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.