Laserfiche WebLink
<br />Motion made by Selectman Weeden <br />Motion: I move that the Town vote to approve Articles 4, 5, 6, 17, 18, 19, 21, 22, 25, 26, & 27 as printed <br />in the Warrant and with the exception of the phrases <br /> <br />Motion passes unanimously at 8:04 PM <br /> <br />Article 28 <br /> <br />To see if the Town will vote to amend Chapter 84 Erosion and Sedimentation Control of the General Bylaws <br />as follows: <br /> <br />Add a new paragraph 14 to §84-4 <br /> <br />Plan and Application Requirement: <br /> <br />14. Description of construction waste management including discarded building materials, concrete truck <br />washout, chemicals, litter and sanitary waste. <br /> <br />Amend §84-5 Control Measures by adding new language/paragraphs and re-numbering accordingly: <br /> <br />§84-5 Control Measures: <br /> <br />A. Measures to prevent the erosion of soils from the property and the sedimentation of drainage <br />structures and adjacent wetlands throughout all phases of construction and at the completion <br />of project shall, at a minimum, include the following: <br /> <br />1. Minimize the amount of disturbed area and protect natural resources; <br />2. Stabilization of cleared areas within fourteen (14) days of clearing or extended inactivity <br />in construction (fourteen (14) days or more) by planting of temporary vegetative cover, <br />mulching, use of erosion control mats or similar measures; <br />3. Protect slopes on the construction site; <br />4. Stabilization or covering of soil stockpiles at the end of each workday; <br />5. Prevention of blowing of dust or sediment from the site by mulching, sprinkling (water), <br />spraying of adhesives or calcium chloride, use of stone, particularly along construction <br />roads, or providing wind barriers; <br />6. Provisions for the maintenance of the erosion and sedimentation control measures, <br />including protect all storm drain inlets and armor all newly constructed outlets; <br />7. Use perimeter controls at the site; <br />8. Stabilize construction site entrances and exits to prevent off-site tracking; <br />9. Control wastes that may be discharged, including but not limited to, discarded building <br />materials, concrete truck wash out, chemicals, litter, and sanitary wastes (these wastes <br />may not be discharged to the MS4; and <br />10. Inspect stormwater controls at consistent intervals. <br /> <br />Amend §84-6 Inspections by adding new language/paragraphs and re-numbering accordingly: <br /> <br />§84-6 Inspections: <br />A. The Director of Public Works or his/her designee including members of the Site Plan Review <br />Committee may enter upon the property of the applicant for the purpose of conducting regular <br />inspections to ensure compliance with the approved Erosion and Sedimentation Control Plan <br /> <br />