My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/16/2026 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
06/16/2026 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2026 9:16:06 AM
Creation date
8/6/2026 9:05:02 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/16/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
updates. have will website Committee Ponds Freshwater involved. properties se owners notify to meeting -k a be will There Commission. servation Mashpee from Committee Oversight <br /> ironmental Mashpee from received were project this support of Letters river. to flowing water levels, water—etc. ponds, between water of movement ;discussed issues Hydrology person. <br /> wastewater Town e.g., administer; someone with partner to needs Applicant discussed. administration ,committee a to money award typically doesn’t Since subcontract. to need <br /> onsultantc het nature, specific highly a of is work If analysis. tissue fish ,e.g. ;analysis PFAS of because more do to asked be will Consultants months. a take which an be will <br /> there t ,meeting Town at approved be first must question het timing, to respect With only. bacteria address to gdesi they’re ;scesspool than better no properties 5 title some ,cesspools <br /> have properties of s hough shore. on right unless seen be will improvement mmediateI .phosphorous than faster moves it concern; of nutrient is nitrogen that Note .away right seen <br /> be \[improvement\] which itrogenn likely direct is improvement mmediatei ,phosphorous egacyl be will there While .edifferenc a detect to effect in is sewering that time from years <br /> a take It .suggested incentive lawn Clover .contributing also is system septic use, fertilizer to respect with encouraged is Education .court in up hold would it whether to as <br /> questionable is it ,bylaw control-nutrient a Mashpee Although .stopped be area in fertilizer whether involved homes many exactly nclearu is It treatment. alum candidates <br /> unlikely Pond) Moody ( Pond Johns lot. parking in waless or remedies vegetative Possibly nutrients. to related ,concern a is PFAS While improved. be these ; called areas water <br /> storm where land undeveloped—considered be will practices land ,sewering than other esistrateg mitigation there whether to respect With history. review will Consultants .ascertained <br /> be will problem phosphorus a is there whether from coming nutrients hereW project. with conjunction in is imingt ;sewering to prior diagnostic completed a be likely will there approves, <br /> T If sewering. after happened what then ,like pond atwh e.g., ;properties around sewer to data baseline Need .problem loading hosphorusp to at looked tiesproper Individual <br /> \].response rittenw Fisher’s Ms. Retain\[ <br /> <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.