My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1996 _REQUIRES REVIEW Minutes
>
9/5/1996 _REQUIRES REVIEW Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 10:23:11 AM
Creation date
11/17/2016 3:30:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
_REQUIRES REVIEW
Meeting Document Type
Minutes
Meeting Date
09/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE HIGH SCHOOL BID EVALUATION FORM <br /> MASHPEE, MASSACHUSETTS EQUIPMENT BIDS - 2/8/96 <br /> PAGE 2 of 2 <br /> SECTION 103 - LIBRARY FURNITURE & EQUIPMENT <br /> NOTES-BID QUALIFICATIONS: <br /> MONITOR EQUIPMENT: <br /> 1.) Delivery is 60-90 days ARO, colors and details. <br /> 2.) Bid offers a DEDUCT of $1,300.00 if awarded Borroughs Metal Storage Shelving (Section 104) and <br /> Borroughs Library Steel Shelving (Section 103 herein) from their Lump Sum Bid. <br /> FURNITURE FIXTURES& EQUIPMENT: <br /> 1.) Jasper Chair and MJ delivery is 10 weeks ARO/colors. <br /> 2.) Worden delivery is 14-16 weeks ARO/colors. <br /> ROBERT H.LORD COMPANY: <br /> 1.) Delivery by August 1996, if order is received by March 1996. See cover letter attached to bid for <br /> individual manufacturers' delivery lead times. <br /> 2.) All items bid in manufacturers' standard colors and construction. <br /> 3.) In the case of any construction delay, R. Lord Co. requires 30-days advance notice prior to requested <br /> ship date in order to change delivery date. <br /> 4.) Should a delay warrant storage charges, the fee will be $500.00 per month with a one-month minimum. <br /> 5.) Re-delivery charage from the storage facility to the site will be billed at $25.00/man, per hour. <br /> 6.) If items are to be off-loaded at the site and put into storage to be installed/assembled at a later date, <br /> the Town will be charged for the extra trip at a rate of $25.00/man hour, including travel time. <br /> 7.) Shelving has been priced according to the bid specifications. If the shelving needs to be modified <br /> after field dimensions, additional modification charges will apply. <br /> EQUIPMENT ENVIRONMENTS: <br /> 1.) Delivery schedule is currently 60-90 days ARO/colors/approved shop drawings (if required). <br />
The URL can be used to link to this page
Your browser does not support the video tag.