My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1996 _REQUIRES REVIEW Minutes
>
9/5/1996 _REQUIRES REVIEW Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 10:23:11 AM
Creation date
11/17/2016 3:30:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
_REQUIRES REVIEW
Meeting Document Type
Minutes
Meeting Date
09/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE HIGH SCHOOL BID EVALUATION FORM <br /> MASHPEE, MASSACHUSETTS EQUIPMENT BIDS - 2/8/96 <br /> PAGE 1 of 1 <br /> SECTION 104 - METAL STORAGE SHELVING <br /> LUMP SUM BID: <br /> Pro-Quip Incorporated Metalware, 18 Gauge $21,753.00 <br /> Hinds &Coon Co. Lyon Metal Products $23,077.00 <br /> Monitor Equipment Company Lyon-Durand 8000 $23,892.00 <br /> Monitor Equipment Company Borroughs Box Edge Plus Steel $24,100.00 <br /> Robert H. Lord Company Borroughs Clip Shelving (AS) $27,289.07 <br /> TOTAL - SECTION 104 $23,077.00 <br /> NOTES- BID QUALIFICATIONS: <br /> PRO-QUIP INC. <br /> 1.) Delivery, as requested. <br /> MONITOR EQUIPMENT COMPANY: <br /> 1.) Delivery 60-90 days ARO. <br /> 2.) Bid offers a DEDUCT of $1,300.00 if awarded Borroughs Metal Storage Shelving (Section 104) <br /> and Borroughs Library Steel Shelving (Section.103) from their Lump Sum bid. <br /> ROBERT H.LORD COMPANY: <br /> 1.) Delivery by August 1996, if order is received by March 1996. See cover letter attached to bid for <br /> individual manufacturers' delivery lead times. <br /> 2.) All items bid in manufacturers' standard colors and construction. <br /> 3.) In the case of any construction delay, R. Lord Co. requires 30-days advance notice prior to requested <br /> ship date in order to change delivery date. <br /> 4.) Should a delay warrant storage charges, the fee will be $500.00 per month with a one-month minimum. <br /> 5.) Re-delivery charage from the storage facility to the site will be billed at $25.00/man, per hour. <br /> 6.) If items are to be off-loaded at the site and put into storage to be installed/assembled at a later date, <br /> the Town will be charged for the extra trip at a rate of $25.00/man hour, including travel time. <br /> 7.) Shelving pricing has been based on bid specifications. If the shelving needs to be modified <br /> after field dimensions, additional modification charges will apply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.