My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1996 _REQUIRES REVIEW Minutes
>
9/5/1996 _REQUIRES REVIEW Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 10:23:11 AM
Creation date
11/17/2016 3:30:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
_REQUIRES REVIEW
Meeting Document Type
Minutes
Meeting Date
09/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE HIGH SCHOOL BID EVALUATION FORM <br /> MASHPEE, MASSACHUSETTS EQUIPMENT BIDS - 2/8/96 <br /> PAGE 2 of 2 <br /> SECTION 105 - CAFETERIA FURNITURE <br /> NOTES-BID QUALIFICATIONS: <br /> ROBERT H.LORD COMPANY: <br /> 1.) Delivery by August 1996, if order is received by March 1996. See cover letter attached to bid for <br /> individual manufacturers' delivery lead times. <br /> 2.) All items bid in manufacturers' standard colors and construction. <br /> 3.) In the case of any construction delay, R. Lord Co. requires 30-days advance notice prior to requested <br /> ship date in order to change delivery date. <br /> 4.) Should a delay warrant storage charges, the fee will be $500.00 per month with a one-month minimum. <br /> 5.) Re-delivery charge from the storage facility to the site will be billed at $25.00/man, per hour. <br /> 6.) If items are to be off-loaded at the site and put into storage to be installed/assembled at a later date, <br /> the Town will be charged for the extra trip at a rate of $25.00/man hour, including travel time. <br /> SCHOOL SPECIALTY: <br /> 1.) Delivery is approximately 3-7 weeks ARO. <br /> 2.) Pricing is guaranteed for 60 days. <br /> 3.) All Krueger items bid in the standard manufacturer's colors. <br /> OFFICE RESOURCES: <br /> 1.) Delivery, as requested. 8 week lead-time. <br /> MASS. CORRECTIONAL INDUSTRIES: <br /> 1.) Bid did not include a bid surety. <br /> PREFERRED SEAT: <br /> 1.) Delivery, as requested. <br /> MONITOR EQUIPMENT COMPANY: <br /> 1.) Delivery is 60-90 days ARO. <br /> EQUIPMENT ENVIRONMENTS: <br /> 1.) Bid prices for Item CF-01 & CF-02 includes chrome powdercoat paint finish. <br /> ADD $1,700 for plated chrome. <br /> 2.) Delivery is 6-8 weeks ARO/colors. If plated chrome option is selected, ADD 2-4 weeks for delivery. <br /> SLAYCO, INC.: <br /> 1.) Bid prices include delivery and installation. <br /> 2.) Bid prices will hold for 90 days. <br /> 3.) All items are bid in manufacturer's standard colors, finishes and construction. <br /> 4.) Items CF-01 and CF-02 are bid with chrome frame and perfect edge. <br /> 5.) Item CF-02 has been bid as an alternate round table in lieu of an oval table. <br />
The URL can be used to link to this page
Your browser does not support the video tag.