My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-BOARD OF HEALTH
TownOfMashpee
>
Town Clerk
>
Minutes
>
BOARD OF HEALTH
>
2000-2009
>
2000
>
2000-BOARD OF HEALTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:58 PM
Creation date
11/17/2016 3:22:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
12/31/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OF MASHPEE <br /> BOARD OF HEALTH <br /> April 13, 2000 <br /> Meeting was called to order at 7:02 p.m. <br /> Members present: Steven R. Ball, Robert F. Cram, Sr., and Elias A. McQuaid <br /> THE TAPE IS NOT PART OF THE MEETING; IT IS FOR THE PURPOSE OF <br /> TRANSCRIPTION ONLY. <br /> Mr. Steven R. Ball, Chairman <br /> 1. Sign warrants. Warrants signed. <br /> 2. Approve Minutes of March 23, 2000 & April 6, 2000 meetings (if available) <br /> Approval of minutes was postponed until all Board members are present. <br /> 3. Letter from Attorney Henchy re: 133 Tide Run <br /> Board acknowledged. <br /> Mr. Cram motioned to postpone discussion and decision on this item until the <br /> Board has had a chance to review pertinent information. Mr. Ball seconded the <br /> motion. Motion passed. <br /> 4. Letter from DPH re: Fish Testing <br /> Board acknowledged. <br /> 5. Copy of letter from E. Baker to CCC (FYI) <br /> Board acknowledged. <br /> 6. Emergency Failure Certifications: <br /> 335 Cotuit Road <br /> Mr. McQuaid indicated that the system has had excessive pumping and that a <br /> 5x7 shallow 1000-gallon pit off the distribution box should be installed. <br /> Board members forwarded their signatures to the emergency failure certification <br /> form. <br /> 7 Alden Lane <br /> Mr. McQuaid indicated that the leach pit is full and that 2 500-gallon drywells <br /> need to be installed in the same location. <br /> Board members forwarded their signatures to the emergency failure certification <br /> form. <br />
The URL can be used to link to this page
Your browser does not support the video tag.