My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-DESIGN REVIEW
TownOfMashpee
>
Town Clerk
>
Minutes
>
DESIGN REVIEW COMMITTEE
>
2000-2009
>
2006
>
2006-DESIGN REVIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 9:19:34 PM
Creation date
11/17/2016 3:19:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/31/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Duck Pond Limited Partnership(continued) <br /> • Height violates zoning by-laws. <br /> • Can't alter grade in calculation;must go by existing grade. <br /> • Mary recommended they do a better job on buffer; Walter added that this Committee has never allowed <br /> cutting of natural 10-foot buffer. <br /> • Mr: Bornstein commented that this is an industrial zone and to do what you want the cost is prohibitive. <br /> Mary responded that all we're asking is you not clear the buffer so we have not caused any costs. <br /> • Walter pointed out that the proposed buildings are not all industrial use; it is mixed usage. <br /> • Walter asked whether or not they have new grading plan. They did not! <br /> • Mary made several suggestions: stagger plantings rather than just lining plantings up; moving shrubs <br /> where they'll do more good; look for more drought tolerant trees; spend money putting plantings where <br /> they do most good. <br /> • Building: Difference between first set of drawings presented for review and second set of drawings, the <br /> building size increased by 40%. <br /> • Mr. Bornstein said he does not feel Cape Cod Commission will have any concern with building height: <br /> • Walter explained that one of the things Design Review does is try to work with aesthetics. One issue is <br /> that it looks like a train. It is over-powering on this size lot. <br /> •. Mr. Bornstein said they would address breaking up the building,but that the height is the height. <br /> • Tom commented that it is a big building, but it has to be attractive. Mr. Bornstein said he would talk to <br /> designers and see what they can do to make it more attractive. . <br /> • Design Review Committee unanimously voted they would not approve what was presented. <br /> • Lee stated that her major concern is that the project is so different from what was reviewed by Cape Cod <br /> Commission. She said this proposal is substantial difference from what was approved. <br /> Conclusion: Not approved. Need Grading Plan and Landscape Plan,which can be on one Plan. <br /> Applicant will bring another set of Site and Building Plans. Plans to be reviewed must be submitted one <br /> week before meeting date. <br /> Approval of Minutes <br /> Minutes of February 9, 2006 as presented were approved by all Committee members, except Mary LeBlanc. <br /> Adiournment...Meeting was adjourned at 10:45 a.m. <br /> Respectfully submitted, <br /> ie <br /> Gilrding Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.