Laserfiche WebLink
Kms• ., <br /> -3- <br /> It was noted that the site engineering plans did not match architectural plans. Walter <br /> acknowledged that they did try to incorporate all of the recommendations of the <br /> committee but failed to provide plans that match. Stuart is to return with corrected plans. <br /> The project is to return to the Cape Cod Commission for modification of their permit. <br /> The commission was not aware of the container storage; traffic concerns should be <br /> addressed when they return for modification. <br /> Conclusion: Not approved. To return with revised plans. <br /> Adjournment. Meeting was adjourned at 11:00 a.m. <br /> Respectfully submitted, <br /> Patricia White <br />