Laserfiche WebLink
i <br /> nif <br /> S , 94/32 <br /> MEMO <br /> TO: Design Review Board (DRB), Mashpee Planning Board (MPB) <br /> Tom Fudala, Town Planner, Rich Stevens, Building Inspector, <br /> George Baker, Fire Chief <br /> FRONT: Don Megathlin, Talanian Realty <br /> SUBJECT: Site Plan Review: Building F-2, South Cape Village <br /> DATE: July 26, 2006 <br /> On April 23, 2003, the MPB approved the Modification to the Special Permit. The site <br /> plan, as approved at that time(prepared by PCA Architects rev. 3/5/03) is almost <br /> identical to what is proposed today (7/26/06) to accommodate a new tenant—Olympia <br /> Sports. Condition #2 requires that prior to the issuance of a building permit for any <br /> structure beyond buildings A&B, a detailed site plan and building elevations should be <br /> submitted for review and approval by the MPB, with review and recommendations from <br /> the DRB. <br /> On July 12. 2006, Tom Fudala requested additional information as part of the site plan <br /> review, and that information, coupled with site plans and elevations are submitted below. <br /> The modification of the Special Permit approved in 2003 indicated a total square footage <br /> of 22.400 sq. ft. for F-l and F-2. That figure has been increased to 22, 767 sq. ft to <br /> accommodate specific design and tenant needs. The additional square footage of 367 sq. <br /> ft. will be deleted from subsequent proposed buildings. Buildings F-2 is 13,235 sq. ft., <br /> increased from 12,400 sq. ft. or an increase of 335 sq. ft. The sidewalk on the Route 23 <br /> slope has been moved slightly to the north. Other than that, there are only very minor <br /> differences with what was proposed in 2003. Obviously, now there is more specificity <br /> and detail to the plans. <br /> The site plan review indicated below involves three elements: <br /> • Building F-2 <br /> • Completion of the landscaped plaza <br /> Parking lot south <br /> 1 <br />