My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-DESIGN REVIEW
TownOfMashpee
>
Town Clerk
>
Minutes
>
DESIGN REVIEW COMMITTEE
>
2000-2009
>
2006
>
2006-DESIGN REVIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 9:19:34 PM
Creation date
11/17/2016 3:19:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
DESIGN REVIEW COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/31/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Duck Pond Limited Partnership(continued) <br /> • Richard Stevens pointed out that we need to know egress; sprinklers; etc. Therefore they should put an <br /> overlay in to show use of open area space. <br /> • Walter said that a cross-section cut through building should be on Plan. He reminded them that this was <br /> requested last time also but is not shown on this Plan. <br /> • Each of the 2 buildings will be 400 feet long and 35 feet tall according to this site plan. It is 22' high <br /> from first to second floor. <br /> • Sheldon, Fire Department, should be at next meeting when this project is to be reviewed. <br /> Conclusion: Daniel Ojala(project engineer),will schedule site review for Applicant and Design Review <br /> Committee to do a walk of the site; Daniel will place rough "stakes" near the property line for this site <br /> visit; Daniel also to bring Plan and mark on the Plan what would be cleared so Design Review can see <br /> what would be left; and Daniel to place flag on 35 foot landscape pole so the Committee and applicant <br /> can see where it can be seen since each of the 2 buildings on the Site Plan are shown to be 400 feet long <br /> and 35 feet tall. Design Review asked Applicant to bring to next meeting with Design Review the Plans <br /> that Cape Cod Commission were shown. Sheldon,Fire Department, should be at next meeting when this <br /> project is to be reviewed. <br /> Aaaroval of Minutes <br /> Minutes of January 5, 2006 as presented were accepted. <br /> Adiournment...Meeting was adjourned at 10:30 a.m. <br /> Respectfully submitted, <br /> Giliberti <br /> ecording Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.