Laserfiche WebLink
107 Commercial Street(continued) <br /> • Tom Fudala said eliminating the buffer at the side that NStar owns shouldn't be a problem. <br /> • Drainage...Tom said Town requires natural retentions. They have basins that are not allowed. <br /> Mr. Lizardi-Rivera said then they can do vegetated retentions. <br /> Next Steps <br /> Go to Board of Selectmen then go to ZBA. Just show on the Plan the site plan change—that <br /> is, the lower parking lot proposal. <br /> Catherine Laurent exited the meeting. <br /> 64 & 168 Industrial Drive <br /> Assessors Map 88 Parcels 34 and 35 <br /> Modifications to existing Special Permit for Expansion of Artisans Showroom <br /> Owners – Mashpee Industrial Realty, LLC <br /> John J. Paulding, Trustees <br /> Care of Keller Co. <br /> Representative – Matthew Eddy <br /> Kevin Kirrane and Matthew Eddy appeared. Mr. Kirrane addressed the Committee explaining that <br /> they've filed 2 applications. They received a special permit to occupy the artisans showroom and in <br /> anticipation of using the rear portion of the building they want to get a jump on this by building a <br /> parking lot on adjacent property owned by someone other than the owner of the building and so they <br /> need a permit to allow use on the adjacent parking lot. Kevin Kirrane said they are working out the <br /> details of the agreement, but they have the approval of the owner to create the parking lot. <br /> Tom Fudala explained that it is likely a proposal will be brought to Town meeting to allow uses to go <br /> in the 1C-Zone and then the entire building could be used for that use. Right now the Artisans <br /> Showroom is using only one side of the building. Tom explained that the 2 applications are...(1) for a <br /> parking lot on a site that is not accessory to something else; and (2) the second application is to allow <br /> the building to use parking on the separate lot. <br /> Matthew Eddy showed the site plan for the parking lot and its location. He said if they do signage, <br /> then they will go through the official review with Design Review on signage; that this is the official <br /> review for the site plan. <br /> • Sheldon Hamblin asked is the building still a wide-open warehouse? Matt Eddy said "yes". <br /> • Rich Stevens asked about diagonal parking...Matt Eddy said you end up with less parking and <br /> sometimes have a safety issue. <br /> • Matt Eddy said they are adding a parking lot and are re-striping current parking area to provide <br /> handicap parking, etc. <br /> • Walter suggested placing a couple of handicap parking spaces in this proposed lot. <br /> • Tom Fudala suggested they seriously look at trying to connect to the other lot. Matt Eddy said <br /> that would get into costly features. <br /> • Rich Stevens asked: When coming to the Building Department will concept be for the whole <br /> building? Kevin Kirrane responded that it will probably be just for the half of the building unless <br /> an applicant comes forward. <br /> 3 <br />